Laserfiche WebLink
TKDA <br />• ENGINEERS • ARCHITECTS • PLANNERS <br />MEMORANDUM <br />To: Thomas D. Prew, P.E. Reference: Fran's Estate <br />444 Cedar Street, Suite 1500 <br />Saint Paul, MN 55101 -2140 <br />(651) 292 -4400 <br />(651) 292 -0083 Fax <br />www.tkda.com <br />Copies To: James E. Studenski, P.E. Drainage Review <br />Proj. No.: <br />From: Connie J. Taillon, P.E. Routing: <br />Date: December 1, 2006 <br />City of Lino Lakes, Minnesota <br />13604.005 <br />The following review is based on this submittal: <br />1. Preliminary Grading, Drainage, Erosion Control, and Utility Plan submitted by Plowe Engineering, <br />Inc., dated November 14, 2006. <br />New comments are in bold and identify items that need to be addressed. <br />Drainage Review Comments: <br />1. Submit infiltration basin sizing calculations for review. <br />11/01/06 Submit infiltration basin sizing calculations for review. <br />12/01/06 Infiltration basin sizing calculations have not been submitted. Please submit for review. <br />2. Submit a Geotechnical Report for review. The low floor elevations are required to be a minimum of 4 <br />feet above the seasonally high ground water table. <br />11/01/06 Submit a Geotechnical Report for review. <br />12/01/06 A Geotechnical Report has not been submitted. Please submit for review. <br />3. Include a note on the Grading Plan indicating that streets shall be kept free from sediment carried by <br />construction traffic. <br />11/01/06 This item has been addressed. <br />12/01/06 A note indicating that streets shall be kept free from sediment carried by construction <br />traffic has been deleted from the current Plan. Insert previous note in Plan. <br />4. Indicate the 10 foot wide wetland buffer, located from the wetland delineation to the proposed lawn <br />areas, on the Grading Plan. Any grading in the buffer area shall be restored with native wetland <br />vegetation. <br />11/01/06 Indicate the type and location of vegetation and/or seed mixtures used for permanent <br />stabilization of disturbed buffer areas on the Plan. <br />An Employee Owned Company Promoting Affirmative Action and Equal Opportunity <br />