Laserfiche WebLink
• <br />• <br />Thus, 15 existing driveway access points on Hodgson and CR J would be reduced to four <br />access points. This reduction from 15 individual, random driveways to four properly <br />designed access points would be a significant public safety improvement. <br />The access points are shown on the final Master Plan. <br />Signalization <br />The Hodgson/CR J intersection should be signalized. The City recognizes the need to plan <br />for the right of way to accommodate signalization. The City also recognizes the need for <br />inter jurisdictional cooperation because CR J forms the border between Anoka and Ramsey <br />Counties and between the Cities of Lino Lakes and Shoreview. Discussions between staff <br />from these jurisdictions have resulted in agreement that the signalization is needed and the <br />recognition that it is a shared responsibility to accomplish this goal. <br />Parcel Size <br />In addition to access needs, the design of new internal roads should allow for the creation of <br />parcels of property that are large enough to develop. The parcels must accommodate <br />buildings, parking, access drives, and site amenities such as landscaping or other features. <br />The street system must take into account existing uses as well as the potential for future <br />development. <br />Right of Way <br />Road rights of way must be large enough to accommodate vehicle movement, pedestrian <br />sidewalks or trails, utility easements, and landscaping. While it is possible to have utilities in <br />separate easements, this uses additional land. It is most efficient to include utilities in the <br />road rights of way. <br />Additional right of way will be needed for Hodgson and CR J, especially at their intersection. <br />The intersection of these arterials will need additional right of way for signalization and turn <br />lanes. The specific dimensions will require further joint planning among Anoka County, <br />Ramsey County, the City of Shoreview, and Lino Lakes. <br />The offset of Ware Road and Mackubin Street should be addressed by acquiring right of way <br />to allow Ware Road to be realigned to the west and form a four -way intersection. The <br />purpose is to eliminate the danger posed by left turns at an offset intersection. Signalizing <br />the Hodgson/CR J intersection will facilitate north/south traffic and eliminate the incentive to <br />cut through the Shoreview neighborhood to avoid delay at the Hodgson/CR J intersection. <br />The City recognizes that providing access to land within the study area probably will take <br />different forms. In the area between Hodgson and Ware Roads, the best approach is a new <br />Draft December 8, 2006 Hodgson/CR J Master Plan page 18 <br />