Laserfiche WebLink
• <br />• <br />public roadway. One end would access CR J, the other end would access Hodgson. The <br />access locations are shown on the Master Plan. <br />To the west of Hodgson, the triangular configuration is not conducive to creating a complete <br />road in a right of way. The study area only has about 300 feet fronting CR J, which does not <br />allow for a public right of way without severely limiting development potential on the <br />property there. The preferred solution there is for the parking drive design to create what <br />would be, in effect, a backage road running up from CR J through property to the north and <br />then out to Hodgson at the location described above. This would require access easements <br />between properties, which would be required as conditions of development approvals. <br />It is possible that such an approach would be appropriate in the eastern part of the study area, <br />between Hodgson and Ware Roads. However, the access drive method requires a larger <br />development plan rather than individual development on numerous small parcels. It also <br />may be possible to create a new public road on the west portion of the study area, but this <br />option is unlikely, as noted above. <br />The width and specific alignments of the internal roads and/or access drives will be examined <br />with potential development designs. However, the points at which they access CR J and <br />Hodgson Road are to be consistent with the descriptions above and as shown on the final <br />Master Plan. <br />Utilities: Water and Sanitary Sewer <br />If the area is to develop, it must have municipal water and sanitary sewer service. Providing <br />these utilities to the study area poses numerous challenges. The water and sanitary sewer <br />figures show the locations of existing municipal utilities. <br />Several potential locations for utility service connections have been considered: <br />• Shoreview <br />• Woodridge Lane <br />• White Pine Road, approximately 1/4 mile to the north of the study area <br />• Ravens Court, approximately 1/8 mile north of the study area <br />• Ware Road <br />There are several common issues for water and sanitary sewer service in this area. For an <br />area that lacks both utilities, it is financially cost effective to plan both in the same alignment. <br />This avoids the need to acquire easements for separate alignments, and both can be <br />constructed at the same time. However, there are some issues that apply to one but not to the <br />other. In particular, the need to loop the water system. Issues for utility service are described <br />below. <br />Draft. December 8, 2006 Hodgson/CR J Master Plan page 19 <br />