Laserfiche WebLink
• <br />• <br />• <br />Environmental <br />Memo <br />To: Jeff Smyser <br />From: Marty Asleson <br />Date: March 1, 2011 <br />Re: Gas Station Review /Main and Lake Drive <br />The following preliminary thoughts and suggestions are listed here in a preliminary <br />review of the proposed gas /convenience store on Lake and Main. It has not been <br />determined yet if the RCWD rules will kick in at this point. If they do, storm water <br />treatment will become more specific. <br />Grading, Drainage and Erosion Control <br />• Infiltration areas must be protected from compaction during construction. <br />Creating a rain garden on the back side of the building would capture <br />water off the rooftop. A treatment train might be established with this <br />pond if stormwater from the north of Main street comes on to the property <br />at the NW corner. <br />Lighting Plan- <br />• Lights must meet our code. Flush mounted, downward focused. <br />Landscaping <br />• Plant larger shade trees on alignment with streets. Plant alternating <br />Hackberry/Northern Pin oak (or oak substitute). Screen on the NW corner <br />• Page 1 <br />