My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11/14/2012 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2012
>
11/14/2012 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2014 3:33:49 PM
Creation date
6/25/2014 11:14:49 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
11/14/2012
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FES <br />77 LF - 12" CMP 10A5% <br />IE= 916.60 <br />12" PVC SANITARY STUB <br />12" PLUG, 15 =891.77 <br />12" DIP WITH <br />12" PLUG ' <br />- . +LF -12 "PVC <br />PNc @ 022% <br />/ / <br />805 <br />IE=91625 <br />3 CY RIP RAP <br />12" <br />/ <br />VALVE <br />8" GATE <br />12 "X8 "TEE <br />MH 02 <br />OUTSIDE DROP <br />RE =91750 <br />15=905.90 E <br />\ IE =892.43 NE, SW <br />38 LF - 15" 11001 @ 0.59% <br />FB-301 <br />/ / / <br />IE=906.85 <br />3 CYCL3 RIP RAP <br />/// / <br />32 LF - 12" HOPE @ 2.2% <br />1 Ir, <br />/ 200 F -8 "PVC @0 % <br />WATERMAI <br />/a__ <br />MH -105 <br />_ WITH SAFL BAFFLE 32" ROOF DRAIN <br />RE= 913.00 �OFiNEC'f <br />IE=908.86 IE= 910.85 <br />SUMP= 904.86 <br />5910 -12 <br />INSTALL 90" ELBOW_ <br />MIN. 1' INTO SUMP PVC @ 2. <br />11 LF /15 ° HOPE @1.0% <br />/ 13 LF .15" HOPE @ 1.2 <br />FES -302 <br />IE =908.15 <br />/ 3 CY CL 3 RIP RAP <br />12° DIP WATERMAIN <br />/// <br />20110 -21 "PVC <br />PVC @0.7% <br />I// / <br />128 LK - 15" HOPE @ 059% <br />CBMH -106 <br />RE=912.15 <br />IE=90358 IN) <br />IE=908.41 (SW) <br />PRINSCO TANK <br />WO U60408 <br />15 =90830 <br />) <br />�� Y L <br />12)12" -BEND / <br />12" DIP WATERMAIN <br />MH 01 <br />• RE= 915.00 <br />IE =890.91 <br />CONNECT TO EXISTING SEWERMAIN <br />CONNECT TO EXISTING WATERMAIN <br />UE pb <br />14.`4-4k <br />\ 102LF -12 "NDPE @1.0% <br />FES-303 <br />10=908.20 <br />3CYCL3 RIP RAP <br />FES -304 - <br />IE= 908.10 <br />3 CYCL3 RIP RAP, <br />PRINSCO TANK <br />WQU60400 <br />IE =90350 <br />• <br />• ;GAS PUMP'. <br />CANOPY <br />s <br />/✓T <br />J <br />LIQUOR STORE <br />13,362 SF <br />FFE= 917.60 <br />SAN SERVICE �� 6" DIP WM <br />(2) CLEAN OUT <br />E= 909.12 <br />.4a0 INVERT AT BOTTOM OF WALL �-\ i! ®'"Z��, <br />- ELEV.; 91350 � -� <br />■ <br />(2)6 "- BEND <br />4'11 <br />RE =916.60 III a <br />p% �� IE =911.87 I' RI <br />III r <br />CBMH -104 <br />RE= 914.50 <br />IE =909.' <br />MH03 <br />RE= 914.30 <br />IE=907.0 1 <br />I6= 906.90 W <br />C1AH -107 <br />WITH SAFL BAFFLE <br />-' RE 91221 ••,L. <br />IE =90921 <br />SAN WYE= 5010 -12" <br />I6 =907.80. NDPE @ 315% 0 <br />" DIP rATERMAIN I ► <br />CO LF- 8" PV 03% <br />3 qii% <br />8 =I <br />94 LF 12 "43PE @0.50%4 <br />38 LF -6 "PVC <br />SAN SERVICE @ 15% <br />Ad <br />is <br />SUMP= 905.13 • <br />INSTALL 90° ELBOW la <br />MIN. 1'INTO SUMP • <br />15 LF -12 "HOPE@ 0.7▪ % <br />37 LF -15 "HOPE@ 1.1% <br />CBMH -108 <br />RE= 911.80 <br />I0 =90932 IN) <br />IE =908.65IW) <br />1410 -15 "HOPE@ 1.1% <br />SAN SERVICE <br />CLEAN OUT <br />1 =90837 <br />GAS STATION <br />8,087 SF <br />FFE= 915.90 <br />6" DIP WM <br />MH 301 <br />RE=917.50 <br />IE :933.45 / <br />97 LF -6 "PVC 8.' <br />SAN SERVICE @ 1.2% <br />6" GATE VALVE <br />8" X 6" REDUCER <br />8" CROSS <br />HYDRANT <br />6" RSV <br />8"X6" REDUCER <br />8"X6" REDUCER <br />MH 03 <br />RE =914.75 <br />11= 908.00 <br />6" GATE VALVE <br />6 "- BEND <br />CB-103 <br />RE =914.50 <br />IE= 910.30 <br />31 LF- 12 "WC@2.0%o 0 <br />11" WYE CONNECTION, IEt <br />0 I. <br />1 <br />B <br />60 <br />12= 00 F RA N <br />CONNECTION <br />11=910.84 <br />L <br />asaRr IONE <br />■14arAnriiminimill <br />3 <br />N P 8 <br />MAIN STREET <br />SUBSURFACE UTILITY NOTE <br />THE SUBSURFACE UTILITY INFORMATION SHOWN ON THESE PLANS 15 A UTILITY QUALITY LEV EL D. THIS QUALITY LEVEL WAS <br />DETERMINED ACCORDING TO THE GUIDELINES OF ASCE /CI 38-02, TITLED "STANDARD GUIDEUNEs FOR THE COLLECTION AND <br />DEPICTION OF EXISTING SUBSURFACE UTILITY DATA." THE CONTRACTOR AND /OR SUBCONTRACTORS SHALL DETERMINE THE <br />EXACT LOCATION OF ALL EXISTING UTILmES BEFORE COMMENCING WORK, BY CONTACTING THE NOTIFICATION CENTER <br />(GOPHER STATE ONE FOR MINNESOTA). THE CONTRACTOR AND /OR SUBCONTRACTOR AGREE TO BE FULLY RESPONSIBLE FOR <br />ANY AND ALL DAMAGES, WHICH MIGHT BE OCCASIONED BY HIS OR HER FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND <br />ALL LURID ES (UNDERGROUND AND OVERHEAD). <br />IF THE CONTRACTOR ENCOUNTERS ANY DRAIN TILE WITHIN THE SITE, HE OR SHE SHALL NOTIFY THE ENGINEER WITH THE <br />LOCATION, SIZE, INVERT AND IF THE TILE LINE IS ACTIVE. NO ACTIVE DRAIN TILE SHALL BE BACKFILLED WITHOUT APPROVAL <br />FROM THE PROJECT ENGINEER. <br />LEGEND <br />PROPOSED EXISTING <br />CURB & GUTTER <br />STORM SEWER • ' M -1 <br />SANITARY SEWER -► -II <br />FORCEMAIN (SAN.) 0- ► IN -0 <br />WATERMAIN <br />EASEMENT <br />DRAINTILE <br />GAS LINE <br />ELECTRIC <br />TELEPHONE <br />0- PP - -i <br />0 -b-(3) <br />©-0084-- 0) <br />rrr - rrs - - • s - rr, <br />UO <br />UE <br />UT <br />U4 <br />YE <br />U• <br />- UTILITY CONSTRUCTION NOTES <br />A. THE UTILITY IMPROVEMENTS FOR THIS PROJECT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE "STANDARD UTILITIES <br />SPECIFICATIONS" AS PUBUSHED BY THE CITY ENGINEERS ASSOCIATION OF MINNESOTA (CEAM), EXCEPT AS MODIFIED HEREIN. <br />CONTRACTOR SHALL OBTAIN A COPY OF THESE SPECIFICATIONS. <br />1. ALL UTILITIES SHALL BE CONSTRUCTED IN ACCORDANCE TO CITY REQUIREMENTS. <br />2. CONTRACTOR SHALL NOT OPEN, TURN OFF, INTERFERE WITH, OR ATTACH ANY PIPE OR HOSE TO OR TAP WATERMAIN <br />BELONGING TO THE CITY UNLESS DULY AUTHORIZED TO DO SO BY THE CITY. ANY ADVERSE CONSEQUENCES OF ANY <br />SCHEDULED OR UNSCHEDULED DISRUPTIONS OF SERVICE TO THE PUBUC ARE THE UABILTTY OF THE CONTRACTOR <br />3. A MINIMUM VERTICAL SEPARATION OF 18 INCHES I5 REQUIRED AT ALL WATERMAIN AND SEWER MAIN (BUILDING, STORM <br />AND SANITARY) CROSSINGS. <br />B. ALL MATERIALS SHALL BE AS SPECIFIED IN CEAM SPECIFICATIONS EXCEPT AS MODIFIED HEREIN. <br />1. ALL MATERIALS SHALL COMPLY WITH THE REQUIREMENTS OF THE CITY. - <br />2. ALL SANITARY SEWER TO BE PVC SDR -35, UNLESS NOTED OTHERWISE. <br />3. ALL WATERMAIN TO BE DUCTILE IRON - CLASS 52, WITH 7.5 FEET MINIMUM COVER. <br />4. ALL STORM SEWER PIPE TO BE REINFORCED CONCRETE PIPE WITH R-4 JOINTS, AND RUBBER GASKETS. <br />5. RIP RAP SHALL BE Mn /DOT CLASS 3. <br />C. CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATIONS AND DIMENSIONS OF VESTIBULE, EXIT PORCHES, <br />RAMPS, TRUCK DOCKS, PRECISE BUILDING DIMENSIONS AND EXACT BUILDING UTILITY ENTRANCE LOCATIONS. <br />D. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND /OR ELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE <br />PLANS 5 BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES AND, WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. <br />THE INFORMATION I5 NOT TO BE RELIED ON AS BEING EXACTOR COMPLETE. THE CONTRACTOR MUST CALL THE APPROPRIATE UTILITY <br />COMPANY AT LEAST 48 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATION OF UTIL(ES. IT SHALL BE THE <br />RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFUCT WITH THE PROPOSED IMPROVEMENTS <br />SHOWN ON THE PLANS. THE LOCATIONS OF SMALL UTILITIES SHALL BE OBTAINED BY THE CONTRACTOR, BY CAWNG GOPHER STATE <br />ONE CALL AT 454-0002. <br />E. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO AVOID PROPERTY DAMAGE TO ADJACENT PROPERTIES DURING THE <br />CONSTRUCTION PHASES 0011I5 PROJECT. THE CONTRACTOR WILL BE HELD SOLELY RESPONSIBLE FOR ANY DAMAGES TO THE <br />ADJACENT PROPERTIES OCCURRING DURING THE CONSTRUCTION PHASES OF THIS PROJECT. <br />F. SAFETY NOTICE TO CONTRACTORS: IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES THE CONTRACTOR WILL <br />LL <br />BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS ON THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY <br />DURING PERFORMANCE OF THE WORK THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING <br />HOURS. THE DUTY OF THE ENGINEER OR THE DEVELOPER TO CONDUCT CONSTRUCTION REVIEW OF THE CONTRACTOR'S <br />PERFORMANCE 15 NOT INTENDED TO INCLUDE REVIEW OFTHE ADEQUACY OF THE CONTRACTOR'S SAFETY MEASURES IN, ON OR NEAR <br />THE CONSTRUCTION SITE. <br />G. ALL AREAS OUTSIDE THE PROPERTY BOUNDARIES THAT ARE DISTURBED BY UTILITY CONSTRUCTION SHALL B RESTORED IN KIND. <br />LL E FS <br />SODDED AREAS SHALL BE RESTORED WITH 6 INCHES OF TOPSOIL PLACED BENEATH THE SOD. <br />H. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING TRAFFIC CONTROL DEVICES SUCH AS BARRICADES, <br />WARNING SIGNS, DIRECTIONAL SIGNS, FLAGMEN AND LIGHTS TO CONTROL THE MOVEMENT OF TRAFFIC WHERE NECESSARY. TRAFFIC <br />CONTROL DEVICES SHALL CONFORM TO APPROPRIATE MINNESOTA DEPARTMENT OF TRANSPORTATION STANDARDS. <br />I. ALL SOILS TESTING SHALL BE COMPLETED BY AN INDEPENDENT SOILS ENGINEER. EXCAVATION FOR THE PURPOSE OF REMOVING <br />UNSTABLE OR UNSUITABLE SOILS SHALL BE COMPLETED AS REQUIRED BY THE SOILS ENGINEER. THE UTILITY BACKFILL CONSTRUCTION <br />SHALL COMPLY WITH THE REQUIREMENTS OF THE SOILS ENGINEER THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING <br />AU. REQUIRED SOILS TESTS AND SOIL INSPECTIONS WITH THE SOILS ENGINEER. <br />J. <br />A GEOTECHNICAL ENGINEERING REPORT HAS BEEN COMPLETED BY: <br />COMPANY: -TBD <br />ADDRESS: <br />PHONE: <br />DATED: <br />THE CONTRACTOR SHALL OBTAIN A COPY OF THIS SOILS REPORT. <br />PRIOR TO PLACEMENT OF AGGREGATE BASE, ATFST ROLL WILL BE REQUIRED ON THE STREET AND PARKING AREA 5UBGRADE. THE <br />CONTRACTOR SHALL PROVIDE A LOADED TANDEM AXLE TRUCK WITH A GROSS WEIGHT OF 25 TONS. THE TEST RO W NG SHALL BE AT <br />THE DIRECTION OF THE SOILS ENGINEER AND SHALL BE COMPLETED IN AREAS AS DIRECTED BY THE SOILS ENGINEER. THE SOILS <br />ENGINEER SHALL DETERMINE WHICH SECTIONS OF THE STREET OR PARKING AREA ARE UNSTABLE. CORRECTION OF THE SUBGRADE <br />SOILS SHALL BE COMPLETED IN ACCORDANCE WITH THE REQUIREMENTS OF THE SOILS ENGINEER. <br />THE TREES AND OTHER NATURAL VEGETATION WITHIN THE PROJECT AND /OR ADJACENT TO THE PROJECT ARE OF PRIME CONCERN TO <br />THE CONTRACTOR'S OPERATIONS. HE WILL BE REQUIRED TO PROTECT THE TREES WHICH ARE TO BE SAVED TO BE SURE THAT <br />EQUIPMENT 5 NOT NEEDLESSLY OPERATED UNDER NEARBY TREES AND SHALL EXERCISE EXTREME CAUTION IN WORKING ADJACENT <br />TO TREES. SHOULD ANY PORTION OF THE TREE BRANCHES REQUIRE REMOVAL TO PERMIT OPERATION OF THE CONTRACTOR'S <br />EQUIPMENT, HE SHALL OBTAIN THE SERVICES OF A PROFESSIONAL TREE TRIMMING SERVICE TO TRIM THE TREES PRIOR TO THE <br />BEGINNING OF THE OPERATION. SHOULD THE CONTRACTORS' OPERATIONS RESULT IN THE BREAKING OF ANY LIMBS, THE BROKEN <br />LIMBS SHOULD BE REMOVED IMMEDIATELY AND CUTS SHALL BE PROPERLY PROTECTED TO MINIMIZE ANY DAMAGE. COSTS FOR <br />TRIMMING SERVICES SHALL BE CONSIDERED INCIDENTAL TO THE GRADING CONSTRUCTION AND NO SPECIAL PAYMENT WILL BE <br />MADE. <br />L THE CONTRACTOR SHALL SUBMIT 2 COPIES OF SHOP DRAWINGS FOR MANHOLE AND CATCH BASIN STRUCTURES TO <br />CONTRACTOR SHALL ALLOW 5 WORKING DAYS FOR SHOP DRAWING REVIEW. <br />M. THE CONTRACTOR AND THEIR SUPPLIER SHALL DETERMINE THE MINIMUM DIAMETER REQUIRED FOR EACH STORM SEWER <br />STRUCTURE. <br />NORTH <br />0 40 80 <br />SCALE IN FEET <br />m ]S.aai tS9=n urn" swntowanaSrMNanlwe <br />ra <br />engineering SUNBYIng planning energy <br />14800 28th Ave N, Ste 140 <br />Rymomh, Minnesota 55447 <br />(163) 476.6010 telephone <br />1763) 476.8532 facsimile <br />www.mtraeom <br />Client <br />Fendier <br />PatEeison <br />r- <br />2 CONSTRUCTION <br />Project <br />BILL'S <br />SUPERETTE <br />Location <br />LINO LAKES, MN <br />Certification <br />I hereby certify that this plan, 00001Sca <br />report was prepared by me or under] dJr9ct <br />supetWston and that i am a duly I <br />professional ENGINEER under <br />of Minnesota <br />Michael C <br />Reg8tra <br />n!S <br />). 2661 Date: 09 /07/2012 <br />the state <br />contact us fora wet signed copy of this <br />available upon request at MFRA, Inc, <br />N <br />office. <br />Summary <br />Designed: MCB Drawn: 885 <br />Approved: MC6 Book / Page: 727/55 <br />Phase: PRELIM Initial 13SUe:09 /07/2012 <br />Revision History <br />No.Date By Submittal / Revision <br />A 0900/12 SEG WATERSHED COMMENTS <br />B 10/15/12 !TA CrlY COMMENTS <br />C 10.25.12 MT MY LANDSCAPE COMMENTS <br />Sheet Title <br />UTILITY PLAN <br />Sheet No. Revision <br />06.01 C <br />Project No FEN19355 <br />
The URL can be used to link to this page
Your browser does not support the video tag.