Laserfiche WebLink
ANALYSIS <br />The final plat is generally consistent with the approved preliminary plat. Drainage and <br />utility easements have been provided for. The additional right -of -way for Main Street <br />has been included on the drawing. All required title work has been submitted. However <br />the following items need to be corrected on the plat document: <br />1. The owner name needs to be corrected consistent with the Title Commitment. <br />2. The dedication statement should be changed to read as follows: "and do hereby <br />donate and dedicate to the public for public use forever the street, and drainage <br />and utility easements as shown on this plat." <br />3. The dedication statement should include a statement dedicating to Anoka County <br />right of access to Lake Drive and Main Street. <br />4. Access Control should be depicted on the map with an opening located at the two <br />access points. <br />5. The signature block for the Planning Commission should be removed. <br />6. The plat name should be corrected in the City Council signature block. <br />Park Dedication <br />A payment in lieu of park dedication is required for the proposed subdivision. The City's <br />fee for commercial property is $2,175 per acre. The total site area is 4.47 acres. The <br />total payment is lieu of dedication is $9,722.25. <br />The developer will be installing bituminous pedestrian and bicycle trail both north and <br />east of the Lake and Main intersection. The park dedication fee will be credited back to <br />the developer for this improvement. <br />Agreements <br />The developer has submitted a "Reciprocal Access and Maintenance Agreement" for <br />review. The purpose of the agreement is to insure access across both lots for ingress and <br />egress to the properties. Additionally, the agreement provides for shared maintenance <br />responsibilities of the storm sewer system including ponds. <br />The development of the site will require the execution of both a Development Agreement <br />and a Stormwater Treatment Operation and Maintenance Agreement. The development <br />agreement will address responsibilities for installation of both public and private <br />improvements, subdivision fees, financial securities and permits. The stormwater <br />agreement provides for ongoing maintenance of facilities, annual inspections and <br />reporting. These will be entered into as a condition of Final Plat approval. <br />RECOMMENDATION <br />Staff is recommending approval of the final plat with the following conditions: <br />Page 2 Rademacher Addition Final Plat P &Z Report 2/13/13 <br />