My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03/13/2013 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2013
>
03/13/2013 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2014 3:22:51 PM
Creation date
6/25/2014 11:43:28 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
03/13/2013
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The development is summarized as follows: <br />1. Density: <br />Gross Site Area 52.6 acres <br />Upland Area 15.0 acres <br />Total Residential Lots 31 <br />Gross Density 0.6 units /acre <br />Net Density 2.1 units /acre <br />Outlots A= Future City well site <br />B, C, D, E, F = Conservation Easements /Wetlands <br />2. The comprehensive plan guides the buildable area for Low Density Sewered <br />Residential land use and it is within the Stage 1A Utility Growth Area. <br />3. Ordinance No. 08 -06 rezoned the site from R -1, Single Family Residential and <br />Rural to Residential Planned Unit Development. <br />4. The project is a conservation development. A Restoration and Management Plan <br />for Conservation Areas has been created specifically for the development and shall <br />be implemented. <br />5. A Homeowners Association shall be established which creates a stewardship fund <br />to implement the Restoration and Management Plan. The fund amount will be <br />based upon cost estimates determined in the Restoration and Management Plan. <br />6. The Planning & Zoning Board opened public hearings on the application on May <br />10, 2006 and closed the hearing on June 14, 2006. <br />7. Outlot A is being deeded to the City for public utility purposes for a future City <br />well. <br />8. Park dedication fees (cash in lieu of land dedication) are calculated at $2,500 per lot <br />x 31 lots = $77,500. These fees will be allocated to the construction costs of the <br />required boardwalk and trail. <br />9. Final Site Development Plans, Sheets C1.01 -L1.01 Revision C, dated 02/11/13, <br />were submitted with the development application. <br />The "Preserve at Lino Lakes" is a Planned Unit Development (PUD). A PUD has two <br />approval stages. The `development stage plan' includes the preliminary plat and <br />establishes the design, conditions, and other elements for the project. The `final plan' <br />includes the final plat and other final specifics that must fulfill the conditions attached to <br />the preliminary stage approval. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.