Laserfiche WebLink
n. A five (5) foot wide sidewalk shall be extended along the south side of Robinson <br />Drive west of Lot 3, Block 5. <br />i. Sheet not legible. <br />o. The buildable area (gross area less wetland) for Lot 1, Block 5 should be shown <br />on the plan. <br />p. The proposed Sunset Avenue right -of -way, north of Robinson Drive, should be <br />labeled accordingly. <br />9. Revisions to Sheet 4a <br />a. The Future Street Access to the south appears to extend into a potential wetland <br />area based on RCWD and MLCSS data. <br />b. Future Street Access shall be relocated to the west to avoid potential wetland <br />impacts. <br />10. Revisions to Sheet 6 <br />a. The landscape plan shall meet the requirements of Section 3. Subdivision 4. Q. <br />Please review. <br />b. The landscape plan shall clearly show the location, type and count of all required <br />trees and shrubs. <br />c. Each tree and shrub shall have its own symbol. <br />d. An actual count of each tree and shrub shall be provided. <br />e. The landscape plan shall clearly show a 15 foot landscape buffer in accordance <br />with Section 3. Subdivision 4. Q. along Lot 1, Block 3, Lot 1, Block 4 and the <br />east side of the trail on Outlot A. <br />i. Plans shall show double row planting for buffer. <br />f. Elms trees are not an allowed species. <br />11. Revisions to Sheet 7 <br />a. See City Engineer letter. <br />b. City native seed mix specifications shall be provided for all ponds, swales, ditches <br />and infiltration areas. <br />c. Transitional mix shall be used when transitioning sod yard areas. <br />12. Revisions to Sheet 8 <br />a. See City Engineer letter <br />13. The Lot Area Summary dated March 20, 2013 shall be revised to include a column for <br />Gross Area, Unbuildable Area (i.e. wetlands) and Net Area. <br />a. This shall be submitted in an Excel spreadsheet. <br />RECOMMENDATION <br />Staff recommends continuing the public hearing and requests the applicant resubmit plans <br />addressing all items listed in Staff Report. <br />ATTACHMENTS <br />1. Site Location <br />2. Aerial Map <br />3. City Engineer Letter dated 9 -3 -2013 <br />Page 4 <br />Century Farm North P & Z Report 09/11/13 <br />• <br />• <br />