My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11/13/2013 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2013
>
11/13/2013 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2014 1:13:51 PM
Creation date
6/26/2014 10:33:09 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
11/13/2013
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />WSB <br />� <br />Associrnes in, engineering• planning- environmental. construction <br />Memorandum <br />To: Jason Wedel, PE, City of Lino Lakes <br />From: Paul Hudalla, PE <br />Date: November 5, 2013 <br />Re: Saddle Club PUD <br />Stormwater Management Plan Review <br />WSB Project No. 2029 -63 <br />701 Xenia Avenue South <br />Suite 300 <br />Minneapolis, MN 55416 <br />Tel: 763 -541 -4800 <br />Fax: 763 - 541 -1700 <br />We have completed a stormwater management review for the Saddle Club PUD in Lino Lakes, <br />MN. <br />The following documents were provided for review: <br />• Preliminary grading and utility plans dated 10/14/13 by Plowe Engineering <br />• NRCS soil maps dated 10/10/13 <br />• Stormwater Management Report dated 10/14/13 by Plowe Engineering <br />• Survey dated 10/14/13 by E.G. Rud & Sons <br />• Soil boring logs dated 3/13/13 by NTI <br />A review of these documents was completed to verify the extent that they are able to meet the <br />City's ordinance for stormwater management and standard engineering practices for stormwater <br />management. As you are aware, the City's Ordinance is currently being updated to reflect the <br />new rules of Rice Creek Watershed District (RCWD). Revisions to the RCWD Rules offer the <br />developer more flexibility than the old rules and, therefore, the proposed stormwater treatment <br />facilities will be reviewed to the new Rules of RCWD. <br />Based on our review, we offer the following comments that should be addressed by the <br />applicant: <br />PROCEDURAL <br />1. Operation and Maintenance Agreement for stormwater management facilities will be <br />required. <br />2. The applicant must receive permits from other agencies prior to construction. Permits <br />needed include the MPCA's NPDES Construction Stormwater Permit and RCWD's <br />Stormwater Management and Erosion Control Permits. <br />St. Cloud • Minneapolis • St. Paul <br />Equal Opportunity Employer <br />wsbeng.com <br />KA02029- 630Wdmin\Docs\MEMOj_wedel stormwater comments 110513.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.