My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12/11/2013 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2013
>
12/11/2013 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2014 10:03:59 AM
Creation date
6/26/2014 11:42:31 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
12/11/2013
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />A <br />WSB <br />- <br />& Associates, Inc. <br />engineering • planning • environmental construction <br />Memorandum <br />To: Katie Larsen, City Planner <br />From: Jason C. Wedel, P.E. <br />Date: December 4, 2013 <br />Re: Northpointe Preliminary Plat Review <br />WSB Project No. 2029 -650 <br />701 Xenia Avenue South <br />Suite 300 <br />Minneapolis, MN 55416 <br />Tel: 763 -541 -4800 <br />Fax: 763 - 541 -1700 <br />The Northpointe Development Preliminary Plat documents received on November 20, 2013 <br />included the following: <br />1. Full size Preliminary Plat drawings prepared by Carlson McCain dated November 8, 2013. <br />Sheets 1 through 20, tree preservation plans, and landscape plans. <br />2. Stormwater Management Plan prepared by Carlson McCain dated November 8, 2013. <br />3. RCWD Permit Application submitted by AJE Companies <br />4. Geotechnical Report completed by Haugo Geotechnical Services dated August 6, 2013. <br />5. Traffic Impact Study prepared by Westwood dated November 12, 2013. <br />General Comments: <br />1. The applicant is to submit an infrastructure improvement phasing plan, and the wetland <br />delineation report and approvals. <br />2. Obtain permits for the project: RCWD, NPDES (multiple phases), MCES, MPCA, MDH, <br />Anoka County, Xcel Energy. <br />3. Remove lots from the Xcel easement. <br />4. In final design use the City's standard specifications and detail plates for construction. <br />5. The City's Comprehensive Plan designates a neighborhood park in the proposed <br />development area and this should be added to the plan. <br />Street and Trail Comments: <br />1. Roadway C is to match a future connection along the Centerville/ Lino Lakes boarder to <br />match the 40' water / sewer easement to the north. The City's Comprehensive Plan shows <br />Birch Street extending through site to the north and connecting with CSAH 14. The <br />proposed roadway system has Birch as T- intersection and should be considered as a through <br />road. <br />2. Cedar Street will need to be overlaid as part of this development. <br />3. Turn lanes at Cedar Street are also required per Anoka County. <br />St. Cloud • Minneapolis • St. Paul <br />Equal Opportunity Employer <br />wsbeng.com <br />S- \ Community Development\ProjectslPlamting Cases \NonhPo ntc- Emmerich Development\Engmeenng\Memo - klarsen - Northpoint - 120413.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.