My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01/09/2008 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2008
>
01/09/2008 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2014 11:18:37 AM
Creation date
6/26/2014 1:06:41 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
01/09/2008
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TKDA <br />ENGINEERS ARCHITECTS - PLANNERS <br />MEMORANDUM <br />1500 Piper Jaffray Plaza <br />444 Cedar Street <br />Saint Paul, MN 55101 -2140 <br />(651) 292 -4400 <br />(651) 292 -0083 Fax <br />www.tkda.com <br />To: Matthew Woodruff, P.E. Reference: Vaughan's 1st Addition <br />Copies To: James E. Studenski, P.E. Preliminary Drainage Review <br />City of Lino Lakes, Minnesota <br />From: Connie J. Taillon, P.E. Proj. No.: 13810.000 <br />Date: December 26, 2007 Routing: <br />• <br />The following drainage review is based on these submittals: <br />1. Vaughan's 1st Addition Grading, Drainage, and Erosion Control Plan, submitted by Metro Land <br />Surveying & Engineering, dated December 14, 2007. <br />2. Vaughan's 1st Addition Stormwater Report, submitted by Metro Land Surveying & Engineering, <br />dated December 14, 2007. <br />New comments are in bold and identify additional items that need to be addressed. <br />The following are significant issues that must be addressed prior to preliminary plat approval: <br />1. Submit stormwater calculations for review. Verify that the existing storm sewer system has the <br />capacity to convey additional runoff from the proposed site. In addition, verify if downstream <br />detention ponds receiving additional runoff from the site are sized appropriately. <br />12/26/07 The proposed conditions drainage map and drainage calculations are not consistent with the <br />current Grading Plan. Submit a revised proposed conditions drainage map and drainage <br />calculations that identify the most current proposed drainage areas and infiltration basin <br />volume. <br />2. Wards Lake is classified as a natural environment lake in the City of Lino Lakes Shoreland <br />Management Overlay Ordinance. The City requires a 150 foot structure setback and a 75 foot shore <br />impact zone for a natural environmental lake, both measured from the OHW. Show the 150 foot <br />structure setback and 75 foot shore impact zone on the plan. In addition, label the percent <br />impervious cover on the plans. <br />12/26/07 This item has been addressed. <br />Additional Items (12/03/07): <br />3. Section 1102.07 of the City Shoreland Management Ordinance states that, "at least 70% of the <br />shore impact zone of a new development shall be preserved in its natural or existing state." Provide. <br />calculations showing that at least 70% of the shore impact zone on Lot 1 is not being disturbed by <br />grading activities. <br />An Employee Owned Company Promoting Affirmative Action and Equal Opportunity <br />
The URL can be used to link to this page
Your browser does not support the video tag.