My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01/09/2008 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2008
>
01/09/2008 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2014 11:18:37 AM
Creation date
6/26/2014 1:06:41 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
01/09/2008
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Main Street Village <br />page 7 <br />• The rate and volume requirements are met for the first phase of the development. Future <br />development (phase two) will require review to ensure it meets these requirements as well. <br />• <br />The proposed plan does not comply with the 6:1 slope requirement for stormwater <br />management areas in the wetland mitigation area on the southern part of the site. This will <br />need to be revised to comply with one of the important water quality requirements of the <br />AUAR. It appears that this would not be difficult to accomplish <br />Archaeological Survey: A Phase 1 cultural resources survey was completed for the site <br />and submitted with the project, as required by the AUAR. The farmstead site was found to be <br />not eligible for historic listing. The survey investigators recommend that no further cultural <br />resources work is necessary. <br />AUAR Fee and Environmental Review: The City Council adopted a fee for new <br />development within the AUAR area. This fee was based on the cost of the AUAR and <br />calculated by anticipating that growth will occur first in the Stage 1 and 2 growth areas. The <br />fee is $269 per acre, and 28.3 acres x $269 results in a fee of $7612. The fee goes toward the <br />costs of preparing the AUAR and is justified because no environmental review is needed for <br />projects within the AUAR area as long as the projects are consistent with the development <br />assumptions in the AUAR. The AUAR fee of $269 per acre must be paid prior to site work <br />commencing. <br />If the AUAR had not been prepared, the standard environmental review rules would apply. <br />The submittal includes about 37,000 sf. A retail commercial project of 200,000 sf or more <br />would require an EAW. It is possible though unlikely that development of the full site would <br />cross that threshold. However, the City would have the ability to require an EAW if there <br />may be the potential for significant environmental effect. <br />Planned Unit Development <br />Section 2, Subd. 10. of the zoning ordinance includes the PUD standards. The zoning <br />ordinance provides for two types of PUD. We have used a rezoning PUD on mixed use <br />projects and others with exceptional design issues such as conservation developments in <br />urbanized areas (with city utilities). We also have a provision for a conditional use permit for <br />a PUD. A commercial residential PUD is allowable under this option. <br />It is important to review the purpose and intent of a PUD. <br />Subd. 10. PUD, Planned Unit Development. <br />A. Purpose and Intent. The purpose of this section of the Zoning Ordinance is to provide for the <br />grouping of lots or buildings for development as an integrated, coordinated unit as opposed to <br />traditional parcel by parcel, piecemeal, or sporadic approach to development. This section is <br />intended to introduce flexibility of site design and architecture for the conservation of land and <br />open space through clustering of Tots, buildings and activities, which promote the goals outlined in <br />the Comprehensive Plan or serve another public purpose. It is further intended that planned unit <br />developments are to be characterized by central management, integrated planning and <br />
The URL can be used to link to this page
Your browser does not support the video tag.