Main Street Village
<br />page 8
<br />architecture, joint and common use and maintenance of parking, open space and other similar
<br />facilities, and harmonious selection and efficient distribution of uses. ...
<br />The PUD, by allowing deviation from the strict provisions of this Ordinance related to setbacks,
<br />heights, lot area, width and depths, yards, etc., by conditional use permit or a mixture of uses by
<br />rezoning to a PUD District, is intended to encourage:
<br />1. A development pattern in harmony with the objectives of the Comprehensive Plan.
<br />2. Innovations in development that address growing demands for all styles of economic
<br />expansion, greater variety in type, design, architectural standards, and siting of structures
<br />through the conservation and more efficient use of land in such developments.
<br />3. The preservation and enhancement of desirable site characteristics such as existing
<br />vegetation, natural topography and geologic features and the prevention of soil erosion.
<br />4. A creative use of land and related physical development which allows a phased and orderly
<br />transition of varying land uses in close proximity to each other.
<br />5. An efficient use of land resulting in smaller networks of utilities and streets thereby lowering
<br />development costs and public investments.
<br />6. Promotion of a desirable and creative environment that might be prevented through the strict
<br />application of City zoning and subdivision regulations.
<br />E. Commercial or Industrial Planned Unit Development, CUP Requirements.
<br />1. Purpose. It is the intent of this section to further the directives of Section 2, Subd. 2 and
<br />establish special requirements for the granting of a conditional use permit to allow flexibility
<br />from the strict provisions of this Ordinance in regard to multiple buildings, shared access/
<br />parking, parking supply reductions, internal setbacks, etc.
<br />Lots: The table lists the submitted data.
<br />•
<br />•
<br />•
<br />gross sf
<br />gross acres
<br />upland sf
<br />upland acres
<br />Lot 1, Block 1
<br />35,175
<br />0.8
<br />35,175
<br />0.8
<br />Lot 2, Block 1
<br />55,831
<br />1.3
<br />55,831
<br />1.3
<br />Lot 1, Block 2
<br />66,196
<br />1.5
<br />61,169
<br />1.4
<br />Lot 2, Block 2
<br />130,031
<br />3.0
<br />130,031
<br />3.0
<br />Outlot A (private road)
<br />96,058
<br />2.2
<br />96,058
<br />2.2
<br />subtotal
<br />383,291
<br />8.8
<br />378,264
<br />8.7
<br />Outlot B
<br />677,301
<br />15.5
<br />588,452
<br />13.5
<br />Otter Lake Road ROW
<br />to be dedicated
<br />4,393
<br />0.1
<br />4,393
<br />0.1
<br />Outlot C
<br />55,779
<br />1.3
<br />7,238
<br />0.2
<br />Outlot D
<br />113,302
<br />2.6
<br />67,896
<br />1.6
<br />total
<br />1,234,066
<br />28.3
<br />1,046,243
<br />24.0
<br />•
<br />•
<br />•
<br />
|