Main Street Village <br />page 9 <br />• The following summarizes the project proposal: <br />• <br />Gross Site Area 28.3 acres <br />Upland Area 24.0 acres <br />Wetland 4.3 acres <br />Currently Proposed <br />Development Area <br />including Outlot A 8.7 acres <br />Water and Sanitary Sewer: The project will be served by municipal utilities. Ample <br />capacity exists in the systems. Water looping through the development ultimately will be <br />needed for proper flow. <br />Wetlands and Stormwater Management: The Rice Creek Watershed District <br />(RCWD) approved the delineation of the wetlands and the mitigation plan in 2006. However, <br />that mitigation plan application did not include wetland fill and mitigation necessary for the <br />future access route (with the southern driveway). Since this will be the main access to the <br />retail center in the future, it is vital to know if this `road' can be constructed. The wetland <br />impacts and mitigation are an integral part of this question. A new wetland delineation was <br />submitted to, reviewed, and approved by the RCWD. This included an amendment to the <br />delineation of the large, southern wetland. <br />Drainage and utility easements must be established that cover and extend 10' beyond the <br />wetlands, in accordance with City requirements. There will be an easement over the <br />incidental wetlands in Outlot C because they will become stormwater ponds. <br />There is no designated floodplain on the site as shown on the FEMA map. <br />The plans show little space for snow storage after plowing. A snow storage area must be <br />designated or snow must be completely removed from the site. <br />This report discusses the AUAR requirements for stormwater management in a previous <br />section. <br />Roads, Access, Traffic, Circulation: A traffic study was prepared for the <br />development. The study analyzes the current proposal (phase one), full development of the <br />site (phase 2), and year 2030. The study assumes the existing bank road will be a full access <br />point with phase one of the development, but be converted to right- in/right -out only with <br />phase two. As to the southern access, it will function properly with a stop sign with full <br />development but will require a traffic signal by 2030 because of the increasing background <br />traffic. <br />The intersection of Otter Lake Road and Main St. will function well until 2030. The AUAR's <br />S traffic analysis also recognized that this intersection will fail at that time. That is, this will <br />occur without the proposed Main St. Village project. This is an important transportation <br />