My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09/09/2009 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2009
>
09/09/2009 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2014 9:43:12 AM
Creation date
6/27/2014 12:25:57 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
09/09/2009
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
North Springs Church CUP <br />page 9 <br />• included in action on this new application and is included in the conditions of approval. <br />However, the setback variances for the building and the parking lane continue to apply. <br />• <br />• <br />CONDITIONS OF APPROVAL <br />The project approval should be subject to the following conditions: <br />1. Issues listed in the August 31, 2009 memo by the City Engineer must be resolved to <br />his satisfaction. <br />2. All necessary permits shall be obtained by the applicant from Anoka County for work <br />in the Lake Drive (CSAH 23) right of way. <br />3. The church shall enter into a site performance agreement for exterior work on the site <br />prior to commencing the work or obtaining a certificate of occupancy. This shall <br />include financial securities according to current City requirements. <br />4. Parking lot lighting must be completed as shown on submitted plan and fixture cut <br />sheets. The pedestal for a light near the Lake Drive driveway is not included on the <br />lighting plan. If a light is to be installed here, it must be determined what type of <br />fixture and a photometric study done to ensure it meets city standards. <br />5. Parking lot lighting shall be turned off no later than two hours after services or other <br />events at night, but no later than 10 p.m. This does not apply to special holiday or <br />other special events. <br />6. If the installed flagpole lighting is to remain or be expanded, a photometric analysis <br />must be submitted that demonstrates it meets city standards. Landscaping around the <br />flagpoles must be revised on a new plan for the area if lighting is to be there. <br />7. Signage is governed by the City's sign ordinance and permits are required for all <br />signs. The location of any ground sign must be identified on a plan. <br />8. If parking or traffic generation create safety problems in the future, the City may <br />revisit the CUP and consider adding additional conditions to resolve such issues such <br />as traffic control personnel or other measures. The City may call a review meeting of <br />representatives from law enforcement officers, the church, and the neighborhood to <br />review traffic issues and ascertain the need for providing traffic control. This <br />condition is in lieu of requiring a traffic study for the church use. <br />9. The parking, landscaping, and any other exterior work shall be completed in <br />accordance with the plans. <br />10. Final site grading and erosion control must be completed in accordance with the <br />approved plans. This includes removal of the old building foundation/slab, re- <br />shooting elevations, grading the rest of the south end of the site and the county <br />roadway ditch to the design criteria, and finishing grading of the rest of the site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.