Laserfiche WebLink
5) Existing roads and intersections providing access to the subdivision <br />must have the structural capacity to accommodate projected traffic from <br />the proposed subdivision or the developer will pay to correct any structural <br />deficiencies. <br />The bridge construction project access routes have adequate <br />structural capacity for the project truckload estimate and any <br />damages to City streets will be corrected by the County /Contractor. <br />9) The proposed development shall be served with adequate and safe <br />water supply. <br />The bridge construction project does not propose to construct and <br />structures that require drinking water. <br />10) The proposed development shall be served with an adequate and safe <br />sanitary sewer system. <br />The bridge construction project does not propose to construct any <br />structures that require sanitary sewer. <br />11) The proposed development shall not result in the premature <br />expenditures of City funds on capital improvements necessary to <br />accommodate the proposed development. <br />The bridge construction project does not require any capital <br />improvements to City infrastructure and therefore no City funds are <br />required. <br />e. Will not involve uses, activities, processes, materials, equipment and <br />conditions of operation that will be detrimental to any persons, property, or the <br />general welfare because of excessive production of traffic, noise, smoke, fumes, <br />glare, or odors. <br />Lino Lakes Zoning Ordinance Administration <br />Amended per Ord. No. 05 -09 2 -7 <br />The bridge construction project is located at a remote site and the <br />County /Contractor will ensure adequate safety procedures along the <br />haul routes. The contractor will obey posted speed limits, maintain <br />access to the police garage, City Hall and any adjacent residences or <br />businesses along the haul routes. <br />Haul times and dates will be coordinated between City and County <br />staff, the Police Department, and the contractor to ensure access to <br />the police garage. Equipment for the project will also be hauled in <br />through the two proposed access routes. <br />Construction of replacement bridges at Chomonix Golf Course <br />Page 8 of 13 <br />• <br />• <br />