Laserfiche WebLink
• <br />f. Will not result in the destruction, Toss, or damage of a natural, scenic or historic <br />feature of major importance. <br />The bridge construction project is located at a remote site and the <br />County /Contractor will ensure adequate safety procedures along the <br />haul routes. All work will take place within City, County and State <br />Right -of -Way along with Anoka County Park Land. <br />1102.09 Shoreland Alterations <br />Subd. 2. Topographic Alterations /Grading and Filling <br />A. Grading, filling and excavations necessary for the construction of <br />structures, sewage, treatment systems, driveways and other uses permitted in <br />the underlying zoning district under validly issued construction permits for these <br />facilities do not require the issuance of a separate grading and filling permit. <br />However, the grading and filling standards in this section must be incorporated <br />into the issuance of permits for construction of structures, sewage treatment <br />systems and driveways. <br />B. Public roads and parking areas are regulated by section 1102.09, <br />Subd. 3 of this ordinance. <br />C. Not withstanding items A. and B. above, a grading and filling permit, in <br />accordance with Section 4, Subd. 33 of the City Zoning Ordinance, will be <br />required for: <br />1. the movement of more than 10 (10) cubic yards of material on <br />steep slopes or within the shore impact zone; and <br />2. the movement of more than 50 cubic yards of material per acre. <br />SECTION 3 <br />Subd. 12. Earth Moving and Land Reclamation. <br />(3) Application. <br />(a) The application for the permit shall be made in writing to the <br />city engineer in a form as the city engineer may designate, shall include <br />information as may be required by the city engineer and shall contain among <br />other things a map or plat of the proposed excavation or fill area showing the <br />confines or limits thereof together with the existing elevations and proposed <br />finished elevations based on sea level readings. The plan shall also include all <br />wetlands, drainageways, tree inventory and preservation plan, erosion control <br />measures, final restoration improvements, and other features as required by the <br />city. <br />Construction of replacement bridges at Chomonix Golf Course <br />Page 9 of 13 <br />