Laserfiche WebLink
ANALYSIS <br />Land Use and Zoning: <br />The zoning is public / semi - public at the bridge construction site and to the north, <br />east, west, and south of the site. The 2002 Comprehensive Plan guides the <br />landuse public / semi - public. The proposed new comprehensive plan guides the <br />landuse park / open space. The closest residential property to the construction <br />site is over 1,100 feet away from the project site. <br />Bridge Construction: <br />The bridge construction will consist of the following activities: <br />The two existing bridges will be demolished with the existing bridge <br />piers being removed to 2 feet below the existing stream bed. <br />The contractor will excavate areas designated for flood plain <br />compensation. <br />Unsuitable soils from under the trails and around the bridge abutments <br />will be removed and used for embankments or hauled out. <br />The site will be dewatered and the concrete bridge abutment and <br />foundation system will then be placed. <br />A steel truss bridge will then be placed on the abutments and set into <br />final position. <br />The irrigation system removed for construction including the pipes <br />suspended from the bridge will then be reconstructed. <br />Landscape, Screening: <br />The bridge construction site is located within the Anoka County Chomonix Golf <br />Course away from any residences or businesses. Landscaping and turf at the <br />construction site will be replaced in the spring as soon as conditions permit. <br />Stormwater Management: <br />The contractor will prevent erosion and debris from entering adjacent waters and <br />wetlands. Silt fence, erosion control blanket, rip rap and mulch will be used to <br />stabilize the site and will remain in place until final stabilization has been <br />obtained. <br />Right of Way: <br />Construction of replacement bridges at Chomonix Golf Course <br />Page 2 of 13 <br />• <br />