Laserfiche WebLink
• <br />All construction work and hauling activities will take place within State, County <br />and City Right of Way and within County Park land. <br />Access and Circulation: <br />Two access routes are proposed. The south access will be from Lake Drive <br />along Aqua Lane. The north access from Lake Drive down Town Center <br />Parkway to the south of City Hall past the police garage and down the park trails <br />to the golf course. The County is proposing to haul 35 to 40 truckloads through <br />the north access and the remaining 50 to 55 through the south. The contractor <br />will obey posted speed limits, maintain access to the police garage, City Hall and <br />any adjacent residences or businesses along the haul routes. Haul times and <br />dates will be coordinated between the City and County staff, the Police <br />Department, and the contractor to ensure access to the police garage. <br />Equipment for the project will also be hauled in through the two proposed access <br />routes. <br />Trail: <br />All cart paths leading to the two bridges to be replaced will be restored to original <br />condition after bridge construction. <br />Permits: <br />Permits, applications and conditional approvals for the bridge replacement <br />project have been received from the following: <br />Rice Creek Watershed District - Conditional Approval Pending Receipt <br />of Changes (CAPROC) dated January 27, 2010. <br />Department of Natural Resources - Water Permit Application. <br />Army Corp of Engineers - letter dated January 20, 2010 granting a <br />permit for the project until August 2011. <br />Specific CUP Conditions: <br />§ 1103.04 ADMINISTRATION. (8) <br />(e) Basis of decision. In passing upon conditional use applications, the <br />City Council shall consider all relevant factors specified in other sections of this <br />chapter and: <br />1. The danger to life and property due to increased flood heights or <br />velocities caused by encroachments; <br />The bridge construction consists of adequate floodplain mitigation <br />for the encroachment on the flood plain. <br />Construction of replacement bridges at Chomonix Golf Course <br />Page 3 of 13 <br />