My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/12/2010 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2010
>
05/12/2010 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2014 12:12:40 PM
Creation date
6/30/2014 11:07:06 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
05/12/2010
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />draft date 5/7/2010 <br />(Zoning Ordinance Section 2, Subd. 10 PUD, Planned Unit Development.) <br />F. Procedure for Processing a Planned Unit Development. <br />1. Stages of PUD. All PUD applications. including rezoning and CUPs. shall be <br />subject to the information submittal requirements and the review process <br />described in Chapter 1001, even if the PUD does not include a subdivision. As <br />described in this chapter and in Chapter 1001. additional information may be <br />required for a PUD compared to other development applications. The <br />information and review processing steps for a PUD are intended to provide for an <br />orderly development and progression of the PUD project Plan, with the greatest <br />expenditure of developmental funds being made only after the City has had <br />ample opportunity for informed decisions as to the acceptability of the various <br />segments of the whole as the plan affects the public interest. The various steps <br />and applications, --e e • _are: <br />a. Application Conference and Neighborhood Meeting. Preliminary discuajons. <br />la. General PUD Concept Plan Application. Collaborative design of and <br />consideration of the overall concept and plan, including the information and <br />process required in this chapter and the information and process required for <br />a concept plan in § 1001. This includes the information. meetings. and <br />process for collaborative design described in § 1001.Thc concept plan review <br />GO. <br />PUD Preliminary Plan Application. <br />Consideration of plans and documents <br />establishing the uses. densities. architectural themes. conditions, <br />management structure and duties, staging, layout of streets, utilities. open <br />space. and building sites, and other elements of the project. including <br />information and process required in this chapter and the information and <br />process required for a preliminary plat in § 1001. <br />•10. ANAlt • Ali • <br />f• mir <br />dc. PUD Final Plan Application. The summary of the entire concept and each <br />a 06 &AM <br />fal-a44Consideration of the Final Plan. which is to serve as a complete, final, <br />detailed, and permanent public record of the PUD and the manner in which it <br />is to be developed. It shall incorporate all prior approved Plans and all <br />approved modifications thereof resulting from the PUD process. including the <br />information and process required in this chapter and the information and <br />process required for a final plat in § 1001. <br />Application Conference. Prior to filing of-an application for PUD, <br />et e "t :e: <br />Zoning Ordinance Sec. 2, Subd. 10—PUD—Page 13 of 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.