My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01/12/2000 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2000
>
01/12/2000 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2014 11:40:24 AM
Creation date
6/30/2014 1:02:50 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
01/12/2000
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />AGENDA ITEM VI D <br />STAFF ORIGINATOR: Mary Kay Wyland <br />DATE: January 12, 2000 <br />TOPIC: PUBLIC HEARING, Shafer Contracting, 7504 Lake Drive, <br />Ordinance Text Amendment and Interim Use Permit <br />DESCRIPTION OF REQUEST: <br />Shafer Contracting has received the contract for concrete pavement resurfacing on 35W <br />from MnDOT. This work is scheduled to take place between April and June /July of <br />2000. The project area is from Sunset Road north easterly to the 35W/35E junction. <br />Shafer Contracting would like to set up their batch plant on the Tagg property (Artic <br />Sandblasting) at 7504 Lake Drive. Temporary, portable concrete batch plants are needed <br />to conform to MnDOT's specifications /limits for concrete placement within 30 minutes <br />of production. This location will provide quick access, reduce traffic conflicts with <br />hauling trucks, eliminate the need for Shafer to dismantle and relocate their plant during <br />resurfacing, and provide timely completion of the project. They have signed a lease <br />agreement with the property owner. <br />In review of this item City Staff has concluded that an interim use permit may be the <br />appropriate vehicle to facilitate this proposal. The property is Zoned LB, Limited <br />Business and is the only LB District within the City. We would propose an Ordinance <br />Text Amendment that would add "Temporary Concrete Batch Plant" as an Interim Use <br />within the Limited Business Zoning District. We would also anticipate, for P & Z <br />information, that in the near future this entire site (the Town Center) will be rezoned to a <br />more appropriate category to facilitate the future plans for the Town Center. This interim <br />use permit would not affect the ultimate development of the area. We see the LB Zoning <br />District in this located as a very temporary condition. A copy of the Ordinance Text <br />Amendment is attached for your information. The Interim Use Permit purpose, procedure <br />and intent is also attached for your information. <br />The City Engineer and the Environmental Board have reviewed this request. Their <br />comments are attached and the conditions of approval incorporate their suggestions. We <br />would recommend approval of an Interim Use Permit to Shafer Contracting for a <br />Temporary Concrete Batch Plant at 7504 Lake Drive with the following conditions: <br />1. The City Adopt Ordinance No. xx -2000 adding Temporary Concrete Batch <br />Plant as an Interim Use to the Limited Business Zoning District. <br />2. The Batch Plant shall be located as far west as possible to avoid negative <br />impacts on the wetlands at the eastern edge of the Tagg property. <br />
The URL can be used to link to this page
Your browser does not support the video tag.