My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01/12/2000 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2000
>
01/12/2000 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2014 11:40:24 AM
Creation date
6/30/2014 1:02:50 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
01/12/2000
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S‘aile4, Ggottactucg. ea. , `list. <br />• <br />• <br />• <br />Land Use Application <br />- Zoning Text Amendment <br />- Interim Use Permit <br />Applicant <br />Shafer Contracting Co., Inc. <br />Box 128 <br />Shafer, MN 55074 <br />(651) 257-5019 <br />Landowner <br />Joel and Elise Tagg <br />7504 Lake Drive <br />Lino Lakes, MN 55014 <br />(651) 784 -4718 <br />Summary of Request <br />Shafer Contracting Co., Inc. holds a contract with The Minnesota Department of Transportation <br />for State Project S.P. 0280 -49 on Interstate 35W between Sunset Drive and the junction with <br />Interstate 35E. <br />The contract covers the concrete pavement resurfacing of the existing 35W roadway surface. <br />MN /DOT specifications require placing concrete within 30 minutes of production, therefore <br />temporary portable concrete batch plants are set up on the project to meet these specifications. <br />Normally, there is sufficient MN /DOT right -of -way within the project limits to set up and <br />operate the batch plant. <br />In this case, there is insufficient right -of -way to set up the batch plant. <br />The Tagg property was chosen because of its close proximity to the project and the fact that it is <br />currently used for light industrial type uses. Also, it is located at the only interchange within the <br />project limits — County Road 23/Lake Drive. <br />This request is for a one time use during the months April through June of 2000. <br />I -35W Project Details <br />Contract time is 61 working days including Saturdays beginning on or about April 17, 2000. <br />Working days do not include inclement weather days. <br />
The URL can be used to link to this page
Your browser does not support the video tag.