S4 it ectgPwadds Goa. , Tort. <br />The project will be constructed in 2 phases. The southbound lanes will be constructed in phase <br />1; the northbound lanes in phase 2. Each phase will require operation of the concrete batch <br />plant. <br />During each phase there is preparatory work prior to concrete paving and finishing work <br />following the paving. Therefore, the batch plant will not operate continuously during each <br />construction phase. <br />Operating Plans <br />The concrete batch plant will be setup at the location shown on the attached layout sheets. <br />We will provide dust control and traffic signs on all haul routes. <br />We will provide temporary erosion control for the plant site. <br />Our operation will conform to all requirements of the MPCA. <br />The site will be restored to its original condition upon completion of the I -35W project <br />which should be in late June 2000. <br />• <br />• <br />