My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/12/2000 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2000
>
07/12/2000 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2014 10:56:36 AM
Creation date
6/30/2014 2:30:10 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
07/12/2000
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL BOARD MEETING <br />• APPROVAL OF AGENDA <br />• <br />MAY 31, 2000 <br />In consideration of audience members, Asleson requested that Agenda Item 6A be considered <br />following Item 4. The Board agreed. <br />The following items were added to the meeting agenda: <br />8A. Tree Mitigation Negotiations <br />8B. Landscape Ordinance <br />8C. Lighting Ordinance <br />The agenda was approved as amended above. <br />CITIZEN COMMENTS <br />Asleson noted the attendance of Nancy Klebba, interested reside ..wand Naturalist at Tamarack <br />Nature Center. No other comments were made. <br />PROJECT REVIEW <br />A. <br />GM Development / Apollo Drive CUP / Stockpi <br />Business District is located on Apollo Dri <br />and west of the Correctional Facility. He n <br />consultant for G.M. Development; "r h de <br />Development would like to stoc <br />the northeast corner, fill an e <br />a length of pipe <br />and build a berm on the <br />Asleson explained the Apollo <br />ng area consideration is just south <br />letter from John Johnson, engineering <br />ribes the project request. G.M. <br />e • . =' base material in an existing borrow pit on <br />and drainage swale, build a new pond and swale <br />ace elevations on the south side of the project, <br />John Johnson, engineer forth- 'pplicant, presented an explanation of the background of <br />the Apollo Business District and their attempt to develop the site. He explained that due <br />to the low elevation, they believe they have lost several potential sales. Because of that, <br />they are proposing a grading plan to import soils to bring the elevation up to a higher <br />level. Mr. Johnson stated they would like to begin that process to import soils and also <br />plan to undertake the drainage solutions necessary to serve this property, except for the <br />far western edge. He stated they made application to the City to begin initial stockpiling <br />which can be done up to 5,000 yards per parcel and then applied for a SUP to conduct the <br />necessary grading and to exceed more than 5,000 yards. <br />Mr. Johnson presented the proposed grading plan and explained the elevation changes <br />that would occur. He requested the Environmental Board's review of this preliminary <br />grading plan and to put into place drainage elements. Mr. Johnson reviewed the direction <br />of drainage, existing storm sewer system, and NURP ponds. He stated they are <br />attempting to install a good drainage system and understand staff has some different ideas <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.