My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/14/2007 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2007
>
02/14/2007 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2014 11:06:10 AM
Creation date
7/1/2014 1:03:31 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
02/14/2007
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />ATTACHMENT 13 <br />MEMORANDUM <br />DATE: January 25, 2007 <br />TO: Jim Studenski <br />FROM: Marty Asleson <br />RE: Holiday Stationstore, Inc. <br />SWPPP Review <br />The following comments should be addressed: <br />1. On Attachment 8, under Erosion Control Notes, language should include <br />NPDS compliance. <br />2. The second paragraph of the Erosion Control Notes, that "stone pads will be <br />installed at all entrance /exit points." <br />3. The fifth paragraph of the same section should start out with "The <br />contractor.... ", and the part about "when at all possible" removed. <br />4. The 6th paragraph should add "sediment deltas removed and slope erosion <br />repaired in 7 days." <br />Erosion and sediment control notes must include: <br />• Narrative /project description, and purpose and goal of the project. <br />• List of sequence of all soil disturbance activities. <br />• Identify receiving waters. <br />• Describe erosion control practices. Describe each control, its purpose, <br />materials required, and installation methods. <br />• Describe sediment control, its purpose, materials required, and installation <br />methods. <br />
The URL can be used to link to this page
Your browser does not support the video tag.