Laserfiche WebLink
Royal Oaks Realty CUP — Materials Storage <br />• Page 4 of 4 <br />• <br />• <br />11. The maximum number of trips per day shall be limited to the lowest <br />figure, either 50 trips per day or the allowable number from the Anoka <br />County Highway Department. <br />12. A rock trench entrance shall be installed and maintained at all times. <br />13. Dust must be confined to the site and be controlled by watering the <br />driveway as necessary. <br />14. Materials hauled in must have vegetation applied within 48 hours of its <br />arrival. <br />15. All construction activity shall be limited to the hours set as follows: <br />Monday through Friday 7:00 a.m. to 7:00 p.m. <br />Saturday 9:00 a.m. to 5:00 p.m <br />Sunday and Holidays No working hours allowed <br />16. Reimburse the City for the cost of periodic inspections by the City for the <br />purpose of determining that the terms under which the permit has been <br />issued are being complied with. <br />17. Post a form of security to the City, conditioned to pay the City the cost and <br />expense of repairing or cleaning any highways, streets, or other public <br />ways within the City made necessary by the special burden resulting from <br />transporting thereon by the applicant material to or from the site, the <br />amount of such cost to be determined by the Council; and conditioned <br />further to comply with all the requirements of this Ordinance and the <br />particular permit, and to save the City free and harmless from all suits or <br />claims for damages resulting from the negligent excavation, removal, <br />storage, or filling of rock, sand, dirt, gravel, clay, or other like material <br />within the City. <br />18. Permits from the Anoka County Highway Department must be submitted <br />to the City prior to any activity. <br />19. The CUP will be reviewed annually. If the site is not kept in compliance <br />with the conditions set forth, the permit will be revoked. <br />This review is based on the following plans and information: <br />1. Site Plan, Received February 9, 2007 <br />