Grandview Page 3 May 23, 2007 <br />Drainage Review <br />City of Lino Lakes, Minnesota <br />05/23/07 This item has been addressed. <br />13. Update the high water level labeled on the Utility Plan for the proposed pond. <br />05/23/07 This item has been addressed. <br />14. Include a curve number of 100 in the HydroCAD model for areas with open water. <br />15. All City maintained storm sewers, including pond outlet structure pipes, are required to be a <br />minimum of 15 inches in diameter. <br />05/23/07 The pond outlet pipes are required to be a minimum of 15 inches in diameter. All city <br />maintained storm sewer is required to be RCP. <br />16. Include notes on the Plan incorporating the following: 1) the infiltration area should not be excavated <br />to final grade until the contributing drainage areas have been constructed and fully stabilized, and 2) <br />final excavation of the infiltration areas should be completed using light tracked equipment to avoid <br />compacting the basin floor. <br />17. To provide a well aerated, highly porous surface, it is recommended that the soils of the Infiltration <br />Basin floor be loosened to a depth of at least 12 inches prior to planting. <br />18. It is hi • hly recommended that plants be used over seed in the Infiltration Basin. Fluctuating water <br />levels following seeding can cause seed to float and be transported downstream of the Infiltration <br />Basin. In addition, it may take up to two growing seasons to establish the function and aesthetic value <br />of mature vegetation using seeds. <br />05/23 /07 This item has been addressed. <br />19. Submit a copy of the NPDES permit for the City's records when available. <br />20. Approval from Rice Creek Watershed District (RCWD) is required. Submit a copy of the RCWD <br />approved permit when available. <br />Additional Comments 05/23/07 <br />21. Provide a 6 inch minimum clearance between the top of orifice and top of weir wall in the pond <br />outlet structure. <br />22. A skimmer structure is required at the outlet of the biofiltration basin. <br />23. Label the storm sewer sizes, inverts, and slopes on the Plan. <br />24. Capture and route runoff from the south end of Stagecoach Trail to the proposed biofiltration <br />basin. <br />25. It appears from the Grading Plan that runoff from the proposed Stagecoach Trail may flow <br />off -site to the north; however, the proposed drainage area map (subcatchment 4) shows the <br />northern area flowing south and ultimately to the pre - treatment basin. Please clarify. <br />