My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/08/2007 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2007
>
08/08/2007 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2014 2:48:28 PM
Creation date
7/2/2014 11:33:32 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
08/08/2007
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TKDA <br />• ENGINEERS • ARCHITEC I S • PLANNERS <br />• <br />MEMORANDUM <br />To: Thomas D. Prew, P.E. Reference: Main Street Village <br />444 Cedar Street, Suite 1500 <br />Saint Paul, MN 55101 -2140 <br />(651) 292 -4400 <br />(651) 292 -0083 Fax <br />www.tkda.com <br />Copies To: James E. Studenski, P.E. Drainage Review <br />Proj. No.: <br />From: Connie J. Taillon, P.E. Routing: <br />Date: July 17, 2007 <br />The following drainage review is based on these submittals: <br />City of Lino Lakes, Minnesota <br />13810.011 <br />1. Main Street Village Preliminary Grading and Erosion Control Plan, and Utility Plan, submitted by <br />Pioneer Engineering, dated May 3, 2007. <br />2. Main Street Village Stormwater Management Plan submitted by Pioneer Engineering, dated July 10, <br />2007. <br />New comments are in bold and identify items that need to be addressed. <br />The following are significant issues that must be addressed prior to Preliminary Plat approval: <br />1. The Geotechnical Report does not indicate the seasonal high ground water elevations for the site, <br />which is identified as the mottled soils or highest anticipated ground table. Provide documentation <br />indicating the highest anticipated groundwater elevation. The lowest floor elevations are required to <br />be 4 feet above the seasonal high groundwater elevation. <br />2. Clarify if the first floor elevations labeled on the Plans are also the lowest floor elevations. <br />The following are minor plan, calculations, and drafting corrections that must be addressed prior to final <br />approval: <br />1. Provide 1 foot contour intervals on the Grading Plan as required in the I -35E Corridor AUAR. <br />07/17/07 This item has been addressed. <br />2. Update the infiltration rate for Pond W 1: West Wetland in the existing conditions model. <br />07/17/07 This item has been addressed. <br />3. The pond outlet pipes are required to be a minimum of 15 inches in diameter. <br />4. Indicate the overland overflow elevations for all infiltration basins, ponds, and low points in the <br />parking areas on the Grading Plan. Low openings are required to be 1 foot above the overflow <br />elevations. <br />Many of the infiltration basins have multiple overflows (storm sewer inlets) as shown on the Plans; <br />however, the infiltration basins are modeled as having only one primary outlet. For example, <br />infiltration basin IA5 appears to have two overflows (catch basins), yet the infiltration basin is <br />modeled as having only 1 primary outlet (1.50'x1' horizontal orifice /grate). Please clarify. <br />05 <br />An Empioyee Owned Company Promoting Affirmative Action and Equal Opportunity <br />
The URL can be used to link to this page
Your browser does not support the video tag.