My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10/10/2007 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2007
>
10/10/2007 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2014 2:34:47 PM
Creation date
7/2/2014 12:11:22 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
10/10/2007
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Department of Public Works <br />Kenneth G. Haider, P.E., Director and County Engineer <br />E/ at.J p o 4 1 j- <br />S (1j NAGS Po rA %pc;aco 'fC� <br />9-od8 <br />1425 Paul Kirkwold Drive <br />Arden Hills, MN 55112 -3933 • (651) 266 -7100 • Fax (651) 266 -7110 <br />E -mail: Public.Works @co.ramsey.mn.us <br />September 7, 2007 <br />Mr. Mark Maloney, PE <br />Public Works Director <br />City of Shoreview <br />4600 Victoria Street N. <br />Shoreview, MN 55126 <br />Re: Highway 49 and County Road J Signal System Improvements <br />Ramsey County Update <br />Dear Mark; <br />We have been in discussions with Anoka County, Lino Lakes and Shoreview for the <br />installation of a signal system at the intersection of Highway 49 and County Road J. <br />Ramsey County staff believes that this project would be a great improvement to all <br />agencies involved to reduce the high amount of delay that is occurring at this intersection. <br />We have reviewed our current funding and workforce status to conduct. the necessary <br />work in order to install a signal system and have determined that we will not be able to <br />meet the pavement widening, mill and overlay portion of this project in 2007. <br />After an August 26th meeting discussing the proposed signal system, a tentative schedule <br />was determined to proceed as early as this fall. Unfortunately, Ramsey County will not <br />be able to fund the proposed paving improvements and meet a project schedule in the fall <br />of 2007. Currently we have over exceeded our maintenance paving budget for 2007. In <br />addition, we believe that the amount of work that needs to be done at this intersection <br />cannot be completed this fall. We are very concerned that we would not have adequate <br />time to get this project completed prior to freeze -up. <br />As an alternative proposal, I have had a meeting with our Maintenance and Engineering <br />staff and have come up with a modified schedule to construct this project in 2008. <br />Ramsey County maintenance would conduct the milling and overlay work and be able to <br />properly fund the proposed project. Doing the work in 2008 will allow the County to <br />apply adequate forces and equipment to get the project completed and allow us to <br />designate the funding in our 2008 program <br />Minnesota's First Home Rule County <br />printed on recycled paper with a minimum of lo% post - consumer content <br />
The URL can be used to link to this page
Your browser does not support the video tag.