My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12/12/2007 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2007
>
12/12/2007 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2014 3:43:22 PM
Creation date
7/2/2014 12:21:56 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
12/12/2007
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TKDA <br />ENGINEERS • ARCHITECTS • PLANNERS <br />MEMORANDUM <br />1500 Piper Jaffray Plaza <br />444 Cedar Street <br />Saint Paul, MN 55101 -2140 <br />(651) 292 -4400 <br />(651) 292 -0083 fax <br />www.tkda.com <br />To: Matthew Woodruff, P.E. Reference: Vaughan's 1st Addition <br />Copies To: James E. Studenski, P.E. Preliminary Drainage Review <br />City of Lino Lakes, Minnesota <br />From: Connie J. Taillon, P.E. Proj. No.: 13810.000 <br />Date: December 3, 2007 Routing: <br />The following drainage review is based on these submittals: <br />1. Vaughan's 1st Addition Preliminary Grading, Drainage, and Erosion Control Plan, submitted by <br />Metro Land Surveying & Engineering, dated October 30, 2007. <br />2. Vaughan's 1st Addition Soil Boring Investigation, submitted by Wenck, dated October 30, 2007. <br />New comments are in bold and identify additional items that need to be addressed. <br />The following are significant issues that must be addressed prior to preliminary plat approval: <br />1. Submit stormwater calculations for review. Verify that the existing storm sewer system has the <br />capacity to convey additional runoff from the proposed site. In addition, verify if downstream <br />detention ponds receiving additional runoff from the site are sized appropriately. <br />2. Verify how the depth on the seasonal high water table was determined on Sheet 2. A geotechnical <br />evaluation should be performed to verify the seasonal high water table. The lowest floor elevation <br />is required to be 4 feet above the seasonal high ground water elevation. <br />12/03/07 This item has been addressed. <br />3. Wards Lake is classified as a natural environment lake in the City of Lino Lakes Shoreland <br />Management Overlay Ordinance. The City requires a 150 foot structure setback and a 75 foot shore <br />impact zone for a natural environmental lake, both measured from the OHW. Show the 150 foot <br />structure setback and 75 foot shore impact zone on the plan. In addition, label the percent <br />impervious cover on the plans. <br />Additional Items (12/03/07): <br />4. Section 1102.07 of the City Shoreland Management Ordinance states that, "at least 70% of <br />the shore impact zone of a new development shall be preserved in its natural or existing <br />state." Provide calculations showing that at least 70% of the shore impact zone on Lot 1 is not <br />being disturbed by grading activities. <br />An Employee Owned Company Promoting Affirmative Action and Equal Opportunity <br />
The URL can be used to link to this page
Your browser does not support the video tag.