My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12/12/2007 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2007
>
12/12/2007 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2014 3:43:22 PM
Creation date
7/2/2014 12:21:56 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
12/12/2007
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kenneth Muehlstedt <br />2221 Reiling Road <br />Lino Lakes, MN 55110 <br />612- 240 -5178 <br />October 15, 2007 <br />RE: Variance Application <br />To whom it may concern: <br />In 1984 the City of Lino Lakes through TKDA & Associates (TKDA) contracted out <br />the installation of Reiling Road to Northern Asphalt. Northern Asphalt sub- <br />contracted the removal of trees and the grading of the road to Dell Contracting; while <br />bulldozing the road, Dell Contracting removed all the front survey pins up and down <br />Reiling Road. I informed John Davidson of TKDA that the survey pins had been <br />removed and Mr. Davidson sent out a survey crew to replace the pins. At the time, <br />Reiling Road dead -ended at my property and only my survey pins were replaced. <br />In 1987 I applied for a permit to build a 26 x 30 garage; I based the placement of the <br />garage on TKDA's survey which at the time was well within the five -foot setback. In <br />1992 Reiling Road was extended west beyond my property. In 2002, Sally <br />Bachmeier and Lloyd Chalupsky purchased lot 10 adjacent to the west of my <br />property. Ms. Bachmeier and Mr. Chalupsky informed me that the northwest corner <br />of my garage was 6 to 8 inches off the setback; they said they didn't have a problem <br />with it but wanted me to be aware of it. There have been numerous disagreements <br />between us which resulted in Ms. Bachmeier and Mr. Chalupsky bringing legal <br />action against me and in turn the courts found that "the Plaintiffs' testimony lacking <br />in credibility ". After losing two trials and an appeal, the setback and other issues <br />became a problem to Ms. Bachmeier and Mr. Chalupsky. <br />A permit was issued for my garage and was inspected and approved by the City of <br />Lino Lakes building official Mr. Pete Kluegel; Mr. Kluegel based his inspections on <br />the same survey done by TKDA. A recent survey done by Hult & Associates (see - <br />attached survey) states "the plat of Otter Lake Hills does not meet the standards set <br />by Minnesota Statue 505 ... ". I am asking for a variance on a very small portion of <br />my garage that was constructed over 20 years ago (see enclosed digital <br />photographs). <br />Also enclosed you will find photos of my driveway which has also been questioned <br />as to the setback requirements. See enclosed survey that shows the driveway <br />setback at 7'1 "; the radius on the west side is closer to the property line but is in the <br />15' right of way. <br />Respectfu y, <br />Kenneth Muehlstedt <br />Enc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.