My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12/12/2007 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2007
>
12/12/2007 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2014 3:43:22 PM
Creation date
7/2/2014 12:21:56 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
12/12/2007
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Main Street Village <br />page 7 <br />vehicles entering site during weekday PM peak hour <br />source: Westwood Professional Services <br />The count for vehicles entering the site are not the only factor to analyze. However, over <br />half of the traffic entering the site in 2030 will enter via the bank road.. These data are <br />important when looking at internal circulation routes and the potential for vehicles <br />stacking out onto public roads. <br />If the entire southern road and access are constructed with phase 1, these data likely will <br />change for phase 1, but the phase 2 and 2030 data will not change. <br />• After the initial S -curve on the slip ramp, there are two driveway intersection points on the <br />entry road before it meets the road north of the bank. The first driveways are placed near <br />the end of the slip ramp. The second driveway intersection is about 85' further south, and <br />the road intersection is about 60' past the driveway. A fast food drive through, gas <br />station, and car wash have important circulation needs in addition to normal retail parking. <br />These needs must be met with safe access and circulation. The traffic analysis showed <br />volumes at entry points. Additional analysis information was submitted in November <br />showing turning counts within the development. Staff is considering this data in <br />reviewing the circulation in this area of the project. <br />During the concept review, staff suggests that the roadway be narrowed to 20' like the <br />slip ramp itself and kept as one -way to the south as far as the second set of driveways. <br />This would keep the traffic from Main St. flowing in one direction as far as the second set <br />of driveways, allowing ample stacking distance before meeting vehicles traveling north. <br />The applicant has responded that the one -way arrangement would not allow for trucks to <br />access the buildings because trucks cannot make the turns into the southern driveways. <br />They submitted several truck circulation drawings in November that show the proposed <br />routes, but do not demonstrate that other routes are not feasible. In addition, one drawing <br />seems to show that truck access through the southern driveway will work for the gas <br />station. We are working with the applicant to resolve these issues. <br />• The existing access road along the north side of the bank will become right- in/right -out in <br />the foreseeable future. Otter Lake Road will be reconstructed in this area in order to <br />accommodate future traffic, and at that time a median will be created. It is possible that <br />Anoka County could require that the existing access be converted to right - in/out with this <br />initial portion (phase one) of the project. Either way, the second, southern access on Otter <br />Lake Road is a key element as it will be the primary access to the development area. <br />This means we must know that the second access can be constructed. We received the <br />geotechnical information (soil borings) for this, and it is possible to build the new access <br />route. The specific timing of the construction of the second access in relation to the <br />phase 1 <br />phase 2 <br />2030 <br />slip ramp entrance <br />189 <br />189 <br />189 <br />46% <br />36% <br />23% <br />bank road entrance <br />220 <br />187 <br />473 <br />54% <br />35% <br />58% <br />southern entrance <br />0 <br />154 <br />154 <br />29% <br />19% <br />source: Westwood Professional Services <br />The count for vehicles entering the site are not the only factor to analyze. However, over <br />half of the traffic entering the site in 2030 will enter via the bank road.. These data are <br />important when looking at internal circulation routes and the potential for vehicles <br />stacking out onto public roads. <br />If the entire southern road and access are constructed with phase 1, these data likely will <br />change for phase 1, but the phase 2 and 2030 data will not change. <br />• After the initial S -curve on the slip ramp, there are two driveway intersection points on the <br />entry road before it meets the road north of the bank. The first driveways are placed near <br />the end of the slip ramp. The second driveway intersection is about 85' further south, and <br />the road intersection is about 60' past the driveway. A fast food drive through, gas <br />station, and car wash have important circulation needs in addition to normal retail parking. <br />These needs must be met with safe access and circulation. The traffic analysis showed <br />volumes at entry points. Additional analysis information was submitted in November <br />showing turning counts within the development. Staff is considering this data in <br />reviewing the circulation in this area of the project. <br />During the concept review, staff suggests that the roadway be narrowed to 20' like the <br />slip ramp itself and kept as one -way to the south as far as the second set of driveways. <br />This would keep the traffic from Main St. flowing in one direction as far as the second set <br />of driveways, allowing ample stacking distance before meeting vehicles traveling north. <br />The applicant has responded that the one -way arrangement would not allow for trucks to <br />access the buildings because trucks cannot make the turns into the southern driveways. <br />They submitted several truck circulation drawings in November that show the proposed <br />routes, but do not demonstrate that other routes are not feasible. In addition, one drawing <br />seems to show that truck access through the southern driveway will work for the gas <br />station. We are working with the applicant to resolve these issues. <br />• The existing access road along the north side of the bank will become right- in/right -out in <br />the foreseeable future. Otter Lake Road will be reconstructed in this area in order to <br />accommodate future traffic, and at that time a median will be created. It is possible that <br />Anoka County could require that the existing access be converted to right - in/out with this <br />initial portion (phase one) of the project. Either way, the second, southern access on Otter <br />Lake Road is a key element as it will be the primary access to the development area. <br />This means we must know that the second access can be constructed. We received the <br />geotechnical information (soil borings) for this, and it is possible to build the new access <br />route. The specific timing of the construction of the second access in relation to the <br />
The URL can be used to link to this page
Your browser does not support the video tag.