• <br />Main Street Village <br />page 8 <br />phasing of development on the site is important because this route is important for the <br />overall circulation of the site. It should be built with phase one. <br />• Lino Lakes has a joint powers agreement with Anoka County that limits the number of <br />accesses that will be allowed on Otter Lake Road (Co. Rd. 84) between Main Street. and <br />Cedar Street. We can have a total of six driveways and three roads. There are five <br />driveways now and two roads. We would prefer to use the allocation wisely. We have <br />suggested that the new southern access on this development site be planned to allow for <br />access to the City's water tower. This would allow the elimination of the existing water <br />tower driveway onto Otter Lake Road: the water tower driveway would be on the new <br />access `road'. An easement to allow City access to the private road is needed. <br />• After meeting with the applicants, we received a sketched revision to the October plans. <br />This shows a reconfiguration to the access to the large retail site. Access to the coffee <br />shop drive through windows would be through the lot's parking lot exclusively. That is, <br />vehicles could not turn west out of the southern gas station driveway to go to the drive <br />through window. This is an improvement to circulation in this location. Coffee window <br />patrons would not be held up by vehicles leaving the gas station, which in turn would need <br />to wait for vehicles stacked at the southbound stop sign. <br />Parking: The site plans show the lot layouts and parking. The zoning ordinance does <br />allow for a reduction in the number of required parking stalls if the applicant demonstrates <br />through a peak parking analysis that the peak demand is less than the normally required <br />number of stalls. A peak parking analysis submitted with the October submittal seems to <br />support the reduced number of parking stalls. The analysis does not address the gas <br />station/car wash lot, so we have to look at that lot by itself and need to ascertain how much <br />square footage should be included in a parking calculation. In addition, there is some <br />reduction of parking on L2 B2 if it is revised as shown in the November e- mailed revision. <br />We are examining the submittals and will discuss the peak parking analysis further with the <br />applicant's consultant. <br />Buildings: The proposal includes four buildings on four separate lots. All the buildings <br />are attractive with brick, rock face block, stucco, EIFS, and metal peaks. A variety of colors <br />and design elements are proposed. The original submittal in May included "Architectural <br />Design Criteria." These are a very good basis for the project. There are a few revisions that <br />would be needed to comply with the City's architectural requirements for commercial <br />buildings. <br />•Lot 1, Block 1, Retail (sheet A2): The proposed 6500 sf retail building includes rock face <br />block and precolored 4" block along with EIFS. We have no colors for this building, which <br />must be supplied. The tallest parapet on this building is 22' high. The building was revised <br />since the first submittal to include glass on the north elevation and we have colors now. The <br />colors and materials establish a visual base - middle -top. The trash location is connected to the <br />building. <br />*Lot 2, Block 1. McDonald's (sheets A2.0, A2.1): The proposed McDonald's <br />building has face brick and EIFS. The brick colors are a typical brick red with dark forest <br />