<br />•
<br />•
<br />Main Street Village
<br />page 15
<br />18. Information on the location, area, and set up of the outdoor seating on Lot 2, Block 1 and
<br />Lot 2, Block 2 must be submitted for review.
<br />19. The submitted signage plan ( "Signage Specifications ") must be amended to comply with
<br />the sign ordinance and monument signs must be located on plans. A revised signage plan
<br />must be submitted for review prior to approval by the P & Z Board.
<br />20. The submitted "Architectural Design Criteria" must be revised to ensure that the
<br />requirements in the Zoning Ordinance, Section 3, Subd. 4.B.4., are fulfilled.
<br />21. City Engineer review comments must be addressed to his satisfaction prior to approval by
<br />the P & Z Board.
<br />This review is based on the following submittals:
<br />1. Existing Conditions & Resource Inventory, rec'd October 26, 2007
<br />2. Preliminary Plat, rec'd October 26, 2007
<br />3. Preliminary Site Plan (two sheets), rec'd October 26, 2007
<br />4. Preliminary Utility Plan (two sheets), rec'd October 26, 2007
<br />5. Preliminary Grading & Erosion Control Plan (three sheets), rec'd October 26, 2007
<br />6. Details, rec'd October 26, 2007
<br />7. Preliminary Landscape Plan and Details (two sheets), rec'd October 26, 2007
<br />8. Preliminary Infiltration Details, rec'd October 26, 2007
<br />9. Preliminary Lighting Plan, rec'd October 26, 2007
<br />10. Building Elevations, Sheets Al, A2, A1.0, A1.1, A2.0, A2.1, A5, and two more
<br />unnumbered sheets, and color renderings received October 26, 2007
<br />11. Phase 1 Cultural Resources Survey, April 12, 2007, rec'd May 8, 2007
<br />12. Traffic Analysis, May 4, 2007, rec'd July 10, 2007
<br />13. Traffic Circulation and Shared Parking Analysis, received October 26, 2007
<br />14. Wetland Permit Application, June 2006 and June 2007, rec'd July 10, 2007,
<br />Notice of Wetland Boundary Modification Request, rec'd July 23, 2007
<br />and revised wetland boundary approval, received October 30, 2007
<br />15. Revised Preliminary Site Plan, Truck Circulation diagrams, and Turning Movements,
<br />received via e -mail November 19, 2007.
<br />
|