• <br />• <br />ENVIRONMENTAL BOARD MEETING SEPTEMBER 24, 2008 <br />- Safety testing results: radon, CO <br />- Preliminary checklist <br />- Energy modeling or testing: blower door, infrared <br />- Erosion control plan <br />- Waste management plan <br />- Site plan <br />- Landscape plan <br />- Water conservation plan <br />Process can be easy or hard. Depending on strategies that are applied. <br />Look at adding investment and time: <br />Process: <br />On -site verification and documentation, rater verification performance testing, <br />photographs, signatures, receipts and invoices. <br />Cost of GreenStar Certification: Take a $300,000 new construction home and <br />make it a LEED certified home would cost $8,500. <br />Homeowner Benefits: <br />Water and energy go down, carbon monoxide, radon, etc. go down. Increased <br />borrowing opportunities, increase selling opportunities, increased risk <br />management and align with personal values. <br />Contractors Benefits: Home Energy Rating System Index <br />Community Benefits: <br />Reduced water, energy, waste <br />Decrease storm water & heat island affect <br />Healthier buildings: radon, CO, VOC <br />Decreased pollution from auto transit <br />Building to future standards <br />Product and Manufacturer responsibility <br />Why Green: Accountability of people to the plant. <br />Ms. Bor stated there is a mixed use proposed development on the east side of the <br />city. It seems that there is opportunity before preplanning to work with city staff <br />to at least consider incorporating. <br />Mr. Asleson stated the biggest problem is the building code is black and white. <br />• Ms. Bor stated she is not sure how it will get developed or by who at this point. <br />4 DRAFT MINUTES <br />