Laserfiche WebLink
RCWD Permit Number 09 -048 <br />6. The applicant must submit a draft legal document providing satisfactory form and description <br />granting ponding and flowage easements over all onsite ponds, wetlands, and other hydrologic <br />features if the municipality with jurisdiction requires such an easement <br />7. The applicant must submit a Draft Declaration for Maintenance of Stormwater Management <br />Facilities acceptable to District engineer and attomey for proposed onsite stormwater <br />management features. <br />8. The applicant must submit a copy of receipt from County Recorder and signed /notarized legal <br />document(s). <br />9. The applicant must submit a cash surety in the amount of $1,500. <br />Stipulations: The permit will be issued with the following stipulations as conditions of the permit By <br />accepting the permit, applicant agrees to these stipulations <br />1. An as -built survey of all stormwater BMPs (ponds, rain gardens, trenches, swales, etc.) is to be <br />submitted to the District for verification of compliance with the approved plans before return of <br />the surety. <br />Exhibits: <br />1. Wetland Delineation Report by Westwood Professional Services dated August 2001 and received <br />8 -27 -2001. (RWCD File #03 -073) <br />2. RCWD letter dated 11 -14 -2001 approving wetland delineation. (RCWD File #03 -073) <br />• 3. RCWD permit application dated 6-12 -2009 and received 6 -12 -2009. <br />4. Project Plan Set (Cover Sheet, Alignment Plan and Tabulation, Construction Plan, Grading and <br />Strom Sewer Plan, Signing Striping and Lighting Plan, Construction Details (2 sheets), Planting <br />Plan, Planting Details) dated 6 -12 -2009 and received 6 -12 -2009. <br />5. Project Narrative dated 6 -12 -2009 and received 6 -12 -2009. <br />6. CD submittal dated 6 -12 -2009 and received 6-12 -2009. <br />7. Drainage and Infiltration Map dated 6-4 -2003 and received 6 -12 -2009. <br />8. Proposed Drainage Areas dated 6 -12 -2009 and received 6 -12 -2009. <br />9. Site Photos dated 6 -2009 and received 6 -12 -2009. <br />10. Geotechnical Evaluation Report dated 8-8 -2002 and received 6 -12 -2009. <br />11. RCWD Better Site Design Techniques Worksheet dated 6 -12 -2009 and received 6-12 -2009. <br />12. HydroCAD models dated 6 -12 -2009 and received 6 -12 -2009. <br />13. Stormwater Pollution Prevention Plan dated May 2009 and received 6-12 -2009. <br />14. Record of Meeting on 6 -30 -2009 by SRF dated 6 -30 -2009 and received 6 -30 -2009. <br />15. Response to Draft Engineer's Report dated 7 -2 -2009 and received 7 -2 -2009. <br />Houston Engineering Inc Page 2 of 4 7/16/2009 <br />