Laserfiche WebLink
• <br />• <br />3. Provide maintenance agreement for pervious parking and <br />infiltration BMP areas. <br />4. A salt tolerant sod or seed and hydro -mulch should be specified in <br />the plant list <br />5. Curb -drop spillway and parking lot on the NE corner and North of <br />the site is undermined and must be repaired. <br />6. A maintenance plan and agreement should be written for all <br />infiltration areas on the site, including annual cleaning of curb drop <br />spillway areas <br />7. No soil should be imported or exported from the site without City <br />staff approval <br />8. An erosion control plan must be submitted. A site for erosion <br />control plan /SWPPP access and erosion inspection logs must be <br />shown on the site plan. <br />9. A concrete washout area must be shown on the map <br />10. If the flag pole is to remain in the plan, than additional large <br />growing shade trees should be added in the plan to screen <br />residents to the east <br />Attachments <br />1. Site Summary <br />2. Landscape Plan <br />3. Landscape Details <br />4. Photometric Lighting Analysis <br />5. Grading Plan <br />6. Shade Tree Placement for Screening Flagpole Lights <br />7. October 2003 Environmental Board Recommendation <br />