Laserfiche WebLink
DRAFT 4 -28 -2010 <br />5. Locations of all storm water management practices, infiltration areas, and <br />• areas not to be disturbed during construction. <br />6. Normal water level, high water level, and emergency overflow elevations <br />for the site and all associated ponding systems. <br />7. For discharges to cold water resources, a description and plans to control <br />temperature from storm water runoff. <br />8. Location of areas where construction will be phased to minimize duration <br />of exposed soil areas. Include map and calculations as necessary of areas of <br />grubbing, clearing, tree removal, grading, excavation, fill, and other disturbance; <br />areas of soil or earth material storage; quantities of soil or earth material to be <br />removed, placed, stored, or otherwise moved on site, and delineated limits of <br />disturbance. <br />9. Location and type of all temporary and permanent erosion prevention, <br />sediment control, storm water runoff, and soil stabilization BMPs, along with <br />procedures to be used to establish additional temporary BMPs as necessary for the <br />site conditions during construction. <br />10. Methods to be used for final stabilization of all exposed soil areas. <br />• 11. Designate a leak -proof or imperviously lined concrete washout area. <br />• <br />12. Managing site waste of all unused building materials by properly <br />disposing of wastes off site and not allowing wastes to be carried by runoff into a <br />receiving channel or storm sewer system. <br />13. Sediment control measures must be in place before any land disturbing <br />activity begins, and measures must remain in place and functional until the site is <br />permanently stabilized. <br />14. Streets shall be cleaned and swept within 24 hours whenever tracking of <br />sediment occurs and before the sites are left idle for weekends and holidays. <br />15. All temporary erosion and sediment control measures, such as silt fence <br />and inlet protection devices, shall be installed prior to any land disturbance <br />activities and shall be removed within 30 days after permanent stabilization is <br />attained. All storm sewer systems and drainage ways must be flushed and cleaned <br />of sediment accumulation and all accumulated sediments must be removed and <br />properly disposed of. <br />15 <br />