My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/23/2011 Env Bd Packet
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2011
>
02/23/2011 Env Bd Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2014 2:38:31 PM
Creation date
7/7/2014 11:57:28 AM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
02/23/2011
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FINAL DRAFT 02 -23 -2011 <br />(d) An outfall structure discharging to a wetland, public water or public water <br />wetland must incorporate a stilling- basin, surge- basin, energy dissipater, placement of ungrouted <br />natural rock riprap or other feature to minimize disturbance and erosion of natural shoreline and <br />bed resulting from stormwater discharges. <br />(e) All new residential, commercial, industrial and other habitable or non - habitable <br />structures, and all stormwater basins, must be constructed so that the lowest floor and lowest <br />entry elevations of structures comply with the following table: <br />Within a landlocked basin, lowest floor elevations must be at least one foot above the surveyed <br />basin overflow elevation. Where a structure is proposed below the runout elevation of a land- <br />locked basin, the low -floor elevation will be a minimum of two feet above the high water level as <br />determined from an estimate of high water levels determined from the highest of either the 100 - <br />year, ten -day runoff event or back -to -back 100 -year, 24 -hour rainfalls. Aerial photos, vegetation, <br />soils, and topography will be used to derive a "normal" water elevation for the basin for the <br />purpose of computing the 100 -year elevation. <br />(f) All stormwater management structures and facilities must be designed for <br />maintenance access and properly maintained in perpetuity to assure that they continue to <br />function as designed. <br />(g) Before work under the permit is deemed complete, as- builts must be submitted <br />demonstrating that at the time of final stabilization, stormwater facilities conform to design <br />specifications. <br />(9) Drainage And Utility Easements <br />(a) If a stormwater management plan involves direction of some or all runoff off of <br />the site, it shall be the responsibility of the applicant to obtain from adjacent property owners any <br />necessary easements or other property interests concerning flowage of water. <br />(b) Easements are required for all stormwater management facilities, stormwater <br />conveyances and on -site floodplain and shall extend a minimum of 10 feet beyond the basin's <br />100 -year storm high water level elevation. <br />18 <br />• <br />• <br />• <br />Regional <br />Elevations <br />Local <br />Detention <br />Basins & <br />Wetlands <br />Infiltration Basins <br />Rain- <br />gardens <br />Ground <br />Water <br />Elevation <br />100yr <br />EOF <br />100yr <br />EOF <br />Bottom <br />100yr <br />EOF <br />EOF <br />Bottom <br />Low Floor <br />Freeboard <br />2 -ft <br />1 -ft <br />0 -ft <br />NA <br />0 -ft <br />NA <br />NA <br />NA <br />4 -ft <br />Low Entry ' <br />Freeboard <br />NA <br />NA <br />2 -ft <br />1 -ft <br />NA <br />2 -ft <br />1 -ft <br />0.5 -ft <br />NA <br />Within a landlocked basin, lowest floor elevations must be at least one foot above the surveyed <br />basin overflow elevation. Where a structure is proposed below the runout elevation of a land- <br />locked basin, the low -floor elevation will be a minimum of two feet above the high water level as <br />determined from an estimate of high water levels determined from the highest of either the 100 - <br />year, ten -day runoff event or back -to -back 100 -year, 24 -hour rainfalls. Aerial photos, vegetation, <br />soils, and topography will be used to derive a "normal" water elevation for the basin for the <br />purpose of computing the 100 -year elevation. <br />(f) All stormwater management structures and facilities must be designed for <br />maintenance access and properly maintained in perpetuity to assure that they continue to <br />function as designed. <br />(g) Before work under the permit is deemed complete, as- builts must be submitted <br />demonstrating that at the time of final stabilization, stormwater facilities conform to design <br />specifications. <br />(9) Drainage And Utility Easements <br />(a) If a stormwater management plan involves direction of some or all runoff off of <br />the site, it shall be the responsibility of the applicant to obtain from adjacent property owners any <br />necessary easements or other property interests concerning flowage of water. <br />(b) Easements are required for all stormwater management facilities, stormwater <br />conveyances and on -site floodplain and shall extend a minimum of 10 feet beyond the basin's <br />100 -year storm high water level elevation. <br />18 <br />• <br />• <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.