Laserfiche WebLink
• <br />• <br />• <br />/ <br />l <br />7 <br />'1 <br />- <br />913 <br />\ <br />MAIN STREET <br />—SOIL EROSION / SEDIMENTATION CONTROL OPERATION TIME SCHEDULE <br />CONSTRUCTION SEQUENCE <br />JAN <br />FEB <br />MAR <br />APR I MAY <br />JUN <br />JUL <br />AUG <br />SEP <br />OCT <br />NOV <br />DEC <br />JAN <br />FEB <br />MAR <br />APR <br />MAY <br />JUN <br />TEMPORARY CONTROL MEASURES <br />UNIT <br />5 <br />STRIP & STOCKPILE TOPSOIL <br />ROUGH GRADE / SEDIMENT CONTROL <br />TEMPORARY CONSTRUCTION ROADS <br />FOUNDATION / BUILDING CONSTRUCTION <br />SITE CONSTRUCTION <br />PERMANENT CONTROL STRUCTURES <br />FINISH GRADING <br />LANDSCAPING / SEED / FINAL STABILIZATION <br />STORM FACILITIES <br />CONTRACTOR OR GENERAL CONTRACTOR TO COMPLETE TABLE WITH THEIR SPECIFIC PROJECT SCHEDULE <br />LEGEND <br />PROPOSED EXISTING <br />CURB & GUTTER <br />STORM SEWER <br />DRAINTILE <br />♦� N —1 0 -- PP --(111 <br />CONTOUR —902— - -901 -- <br />RIP RAP <br />OVERFLOW ELEV. <br />SILT FENCE <br />SILT DIKE <br />LIMITS OF DISTURBANCE <br />SOIL BORINGS <br />DIRECTION OF <br />OVERLAND FLOW <br />TEMPORARY DIVERSION <br />DITCH <br />CHECK DAM <br />LIMITS OF DRAINAGE <br />SUB -BASIN <br />BIO -ROLL <br />)0K5 <br />INLET PROTECTION DEVICE 1 01P—I <br />INLET PROTECTION DEVICE 2 ®P -2 <br />TEMPORARY STONE <br />CONSTRUCTION-ENTRANCE <br />TEMPORARY SEDIMENT BASIN <br />TEMPORARY STORAGE AND PARKING AREA <br />TEMPORARY STABILIZATION MEASURES <br />(SEED, MULCH, MATS OR BLANKETS AS <br />OUTUNED IN THE SWPPP) <br />_SEQUENCE OF CONSTRUCTION <br />PHASE 1: <br />1. INSTALL STABILIZED CONSTRUCTION ENTRANCES. <br />2. PREPARE TEMPORARY PARKING AND STORAGE AREA. <br />3. CONSTRUCT THE SILT FENCES ON THE SITE. <br />4. CONSTRUCT THE SEDIMENTATION AND SEDIMENT TRAP BASINS. <br />5. HALT ALL ACTIVITIES AND CONTACT THE CIVIL ENGINEERING CONSULTANT TO PERFORM <br />INSPECTION OF BMPs. GENERAL CONTRACTOR SHALL SCHEDULE AND CONDUCT STORM WATER <br />PRE -CONSTRUCTION MEETING WITH ENGINEER AND ALL GROUND DISTURBING CONTRACTORS <br />BEFORE PROCEEDING WITH CONSTRUCTION. <br />6. CLEAR AND GRUB THE SITE. <br />7. BEGIN GRADING THE SITE. <br />8. START CONSTRUCTION OF BUILDING PAD AND STRUCTURES. <br />Q7,a ST -9 Q13 PA -10 <br />PHASE 11: <br />1. TEMPORARILY SEED DENUDED AREAS. <br />2. INSTALL UTILITIES, UNDERDRAINS, STORM SEWERS, CURBS AND GUTTERS. <br />3. INSTALL RIP RAP AROUND OUTLET STRUCTURES. <br />4. INSTALL INLET PROTECTION AROUND ALL STORM SEWER STRUCTURES. <br />5. PREPARE SITE FOR PAVING. <br />6. PAVE SITE. <br />7. INSTALL INLET PROTECTION DEVICES. <br />8. COMPLETE GRADING AND INSTALL PERMANENT SEEDING AND PLANTING. <br />9. REMOVE ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES (ONLY IF SITE IS <br />STABILIZED), IF REQUIRED BY THE CONTRACT <br />NOTE TO CONTRACTOR <br />THE EROSION CONTROL PLAN SHEETS ALONG WITH THE RESTOF THE SWPPP MUST BE KEPT <br />ONSrTE UNTIL THE NOTICE OF TERMINATION I5 FILED-WITH THE MPCA, THE CONTRACTOR MUST <br />UPDATE THE SWPPP, INCLUDING THE EROSION CONTROL PLAN SHEETSAS NECESSARY TO INCLUDE <br />ADDITIONAL REQUIREMENTS, SUCH AS ADDITIONAL OR MODIFIED BMPS DESIGNED TO CORRECT <br />PROBLEMS IDENTIFIED. AFTER FILING THE NOTICE OF TERMINATION, THE SWPPP, INCLUDING THE <br />EROSION CONTROL PLAN SHEETS, AND ALL REVISIONSTNT. MUST BE SUBMITTED TO THE-OWNER, <br />TO BE KEPT ON FILE IN ACCORDANCE WITH THE RECORD RETENTION- REQUIREMENTS DESCRIBED <br />IN THE SWPPP NARRATIVE. <br />AREA SUMMARY IN ACRES <br />PAVEMENT AREA <br />1 2.02 ACt <br />BUILDING AREA <br />10.49 ACt <br />SEEDED AREA <br />10.1.4 AC± <br />TOTAL DISTURBED <br />14.98 AC± <br />PRE - CONSTRUCTION IMPERVIOUS <br />10.02 ACt <br />POST - CONSTRUCTION IMPERVIOUS <br />13.07 ACt <br />• REFER TO SHEET C5.03 FOR GENERAL NOTES, MAINTENANCE <br />NOTES, LOCATION MAPS, AND STANDARD DETAILS <br />EROSION CONTROL MATERIALS <br />QUANTITIES <br />ITEM <br />UNIT <br />QUANTITY <br />SILT FENCE <br />LINEAR FEET <br />2500 <br />SILT DIKE <br />LINEAR FEET <br />0 <br />BIO -ROLL <br />LINEAR FEET <br />100 <br />CONSTRUCTION ENTRANCE <br />UNIT <br />1 <br />INLET PROTECTION DEVICE (10 -1) <br />UNIT <br />1 <br />INLET PROTECTION DEVICE (10 -2) <br />UNIT <br />5 <br />NORTH <br />0 40 <br />80 <br />SCALE IN <br />FEET <br />fra <br />englneenng surveying planning energy 4 <br />14800 28th Ave. 0 Ste 140 <br />Plymouth, Minnesota 55447 <br />[7631476.6010 telephone <br />17631 476.8532 facsimile <br />www.mfra.com <br />Client <br />Patterson <br />T CONSTRUCTION <br />Project <br />BILL'S <br />SUPERETTE <br />Location <br />LINO LAKES, MN <br />Certification ``O�1 <br />I hereby certify that this plan, specinnt <br />supervision was and prepared by me or y li o 'roc[ <br />supervision andthati under th the state <br />of Minnesota. aC` <br />_ <br />Michael C <br />Registre <br />e ap <br />1. 2661 Date: 09/07/2012 <br />♦ contact us fora wet signed copy-of-this <br />1 available upon request at4d00A Inc., <br />MN office. <br />Summary <br />Designed: Mai Drawn: ABS <br />Approved: MCB Book / Page: 727/55 <br />Phase: PRELIM Initial Issue: 09 /07/2012 <br />Revision History <br />No. Date By Submittal / Revision <br />A 09/20/12 SEG WATERSHED COMMENTS <br />6 1D/15/12 ITA Cm' COMMENTS <br />Sheet Title <br />EROSION AND <br />SEDIMENT <br />CONTROL PLAN <br />PHASE II <br />Sheet No. Revision. <br />C5.02 B <br />Project No. FEN19355 <br />immomavassz <br />