Laserfiche WebLink
EROSION & SEDIMENTATION CONTROL NOTES & DETAILS / "SITE MAP" <br />SITE LOCATION MAP <br />NOT TO SCALE <br />G <br />c.00O <br />'o ab <br />CONSTRUCT 2' HIGH BERM WITH <br />MAXIMUM SIDE SLOPE OF 4:1 <br />2" TO 3" GRAVEL <br />093Or�70 f C <br />oo�YOA oO.� <br />-X. <br />.Cluj <br />c u -� <br />-0083b, <br />X0 gp Q o <br />oocvj <br />•p <br />NOTE: THE R00( ENTRANCES SHALL BE INSTALLED <br />PRIOR TO THE STAIR OF ANY SITE WORK THE ROCK <br />ENTRANCES SHALL BE INSPECTED - FOLLOWING EACH <br />RAINFALL. MAINTENANCE OFTHEROCK ENTRANCES <br />SHALL INCLUDE TOP DRESSING OF NEW GRAVEL OR <br />REMOVAL AND REPLACEMENT OF THE GRAVEL AS <br />NEEDED, TO KEEP THE ENTRANCE FREE FROM <br />COLLECTED MUD. <br />ROCK ENTRANCE DRIVE <br />NOT TO SCALE <br />DEVELOPER/OWNER: <br />)C00000( <br />XXXXXXX( <br />*a- XXX -XXXX <br />500 OPERATOR / GENERAL CONTRACTOR <br />SUPERINTENDENT: <br />5' MIN. <br />ITYP4 <br />2° X 2° WOOD OR <br />STEELT -PO5T5 <br />SITE LOCATION <br />siRi'GTf <br />USGS MAP <br />NOT TO SCALE <br />DIRECTION OF <br />DRAINAGE <br />WOVEN MOW/FILAMENT <br />GEOTEXTILE MATERIAL <br />MCKFILL 6" X 3" <br />TRENCH <br />UNDISTURBED SOIL <br />-SILT FENCE DETAIL <br />NOT TO SCALE <br />ATTACH THE WOVEN WIRE <br />FENCE TO EACH POST WTI <br />THREE WIRE TES OR OTHER <br />FASTENERS (SEE NOTE 1) <br />CROSS BRACE <br />2° X 4" WOOD ER <br />D - /RH GNAT ROP IN <br />WOVEN WIRE <br />FENCE WITH SILT <br />FENCE MATERIAL <br />COVER <br />EXTEND WIRE FENCE <br />A MIN. OF 3" INTO <br />GROUND <br />EXTEND SILT FENCE <br />MATERIAL A MIN. Of <br />11-0" INTO GROUND <br />5' MIN <br />OVERU <br />SIGN TO INDICATE THE <br />LOCATION OF THE CONCRETE <br />WASHOUT AREA <br />BERM AROUND PERIMETER <br />�,gy_ <br />7-0" MIN <br />. T�iTY /b-_ <br />_�� <br />12" MI <br />COMPACTED EMBANKMENT <br />MATERIAL (MP.) <br />SILT FENCE MATERIAL TO BE <br />FASTENED SECURELY TO WOVEN <br />WIRE EENCE WITH THREE TES <br />SPACED AT 30" ON CENTER (SEE <br />NOTE 1) <br />SECURELY FASTEN OVERLAPPING <br />ENDS OF SILT FENCE MATERIAL <br />TO ADJACENT STAKES WITH <br />THREE WIRE TES OR OTHER <br />FASTENERS <br />POSTS: 2 X 4 WOODEN STAKE FENCE: <br />WOVEN WIRE, 14 -1/2 GA, 6" MAX. MESH <br />OPENING FABRIC: IN ACCORDANCE WITH <br />ATM D 6461 LATEST EDITION. <br />1 ATTACH THE WOVEN WIRE FENCE TO EACH POST ND THE GEOTEXTILE TO THE WOVEN WIRE FENCE <br />(SPACED EVERY 30 ") WITH THREE WIRE TIES OR OTHER FASTENERS, ALL SPACED WITHIN THE TOP 8° OF <br />THE FABRIC. ATTACH EACH TIE DIAGONALLY 45 DEGREE THROUGH THE FABRIC, WITH EACH PUNCTURE <br />AT LEAST 1" VERTICALLY APART. <br />2 WHEN TWO SECTIONS OF SILT FENCE MATERIAL ADJOIN EACH OTHER, THEY SHALL BE OVERLAPPED <br />ACROSS TWO POSTS. <br />3. MAINTENANCE SHALL BE PERFORMED AS NOTED I THE SWPPP. DEPTH OF ACCUMULATED SEDIMENTS <br />MAY NOT EXCEED ONE -HALF THE HEIGHT OF THE FABRIC. MAINTENANCE CLEANOUT MUST BE <br />CONDUCTED REGULARLY TO PREVENT ACCUMULATED SEDIMENTS FROM REACHING ONE -HALF THE <br />HEIGHT OF THE SILT FENCE MATERIAL ABOVE GRADE. <br />4. ALL SILT FENCE INLETS SHALL INCLUDE WIRE SUPPORT. <br />-SILT FENCE INLET PROTECTION (IP -1) <br />NOT TO SCALE <br />NOTES: <br />B'XB' MIN OR AS <br />TP��-- -- REQUIRED TO <br />CONTAIN WASTE <br />CONCRETE <br />GROUND SURFACE <br />12° MIN <br />3:10R FLATTER <br />SIDE SLOPES <br />1. CDNCRETE WASIIOUTAREA SHALL BE INSTALLED PRIOR TO ANY CONCRETE PLACEMENT <br />ON SITE <br />2. CONCRETE WASHOUT AREA SHALL BE LINED WITH MINIMUM 10 MIL THICK PLASTIC <br />LINER. <br />3. VEHICLE TRACKING CONTROL* REQUIRED IF ACCESS TO.ONCRRE WASHOUT AREA L5 <br />OFF PAVEMENT. <br />4. SIGNS SHALL BE PLACED AT THE CONSTRUCTION ENTRANCE, AT THE WASHOUT AREA, <br />AND ELSEWHERE AS NECESSARYTO CLEARLY INDICATETHELOCATION OF THE <br />CONCRETE WASHOUT AREA TO OPERATORS OF CONCRETE TRUCKS AND PUMP RIGS. <br />5. THE CONCRETE WASHOUT .AREA SHALL BE REPAIRED AND ENLARGED OR CLEANED OUT <br />AS NECESSARY TO MAINTAIN CAPACITY FOR WASTED CONCRETE. <br />6. AT THE END OF CONSTRUCTION, ALL CONCRETE SHALL BE REMOVED FROM THE SITE <br />AND DISPOSED OF AT AN ACCEPTED WASTE SITE. <br />WHEN THE CONCRETE WASHOUT AREA I5 REMOVED, THE DISTURBED AREA SHALL 131 <br />SEEDED AND MULCHED OR OTHERWISE STABILIZED IN A MANNER ACCEPTED BY THE <br />Cm:- <br />CONCRETE WASHOUT AREA <br />NOT TO SCALE <br />DEFLECTOR PLATE <br />OVERFLOW 1 - CENTER OF FILTER ASSEMBLY <br />OVERFLOW 2 -TOP O CURB BOX <br />10" FILTER ASSEMBLY <br />HIGH -FLOW FABRIC <br />MIRAFI 11101 <br />rsi <br />- 306] <br />ar <br />ROAD DRAIN CASTING APPLIC4BILTY <br />• NEENAH 3 -3067 <br />• NEENAH R -3512 <br />ROAD DRAIN INLET PROTECTION (IP -2) <br />NOT TO SCALE <br />CURB <br />- GENERAL EROSION NOTES: <br />.. CONSTRUCTION SHALL COMPLY WITH ALL APPLICABLE GOVERNING CODES AND BE CONSTRUCTED TO SAME. WHERE A CONFLICT EXISTS BETWEEN LOCAL JURISDICTIONAL STANDARD <br />SPECIFICATIONS AND MFRA STANDARD SPECIFICATIONS, THE MORE STRINGENT SPECIFICATION SHALL APPLY. <br />THE CONTRACTOR 5 SPECIFICALLY CAUTIONED THAT THE LOCATIONS AND /03 ELEVATIONS OF EXISTING UTILITIES AS SHOWN ON THESE PLANS ARE BASED ON RECORDS OF THE <br />VARIOUS UTILITY COMPANIES AND, WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE SUBSURFACE 01111TY INFORMATION SHOWN ON THESE PLANS L5 A UTILITY QUALITY <br />LEVEL X. THIS QUALITY LEVEL WAS DETERMINED ACCORDING TO THE GUIDELINES OF 0 /A5CE 3802, ENTITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF <br />EXISTING SUBSURFACE Im1RY DATA. °THE INFORMATION IS NOT TO BE RELIED ON AS BEING 40411 OR COMPLETE. THE CONTRACTOR MUST CONTACT ALL THE APPROPRIATE UTILITY <br />COMPANIES AT LEAST 48 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATION OF UTILITIES. IT SHALL BE THE RESPONSIBILTY OF THE CONTRACTOR TO RELOCATE <br />ALL EXISTING UTILm5 WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. THE LOCATIONS OF SMALL UTILITIES SHALL BE OBTAINED BY THE <br />CONTRACTOR BY CALLING MINNESOTA GOPHER STATE ONE CALL A7800-252-1166 OR 651 -454-0002 <br />3 THE DESIGN SHOWN 13 BASED UPON THE ENGINEER'S UNDERSTANDING OF THE EXISTING CONDmONS. THE EXISTING CONDITIONS SHOWN ON THIS PLAN ARE BASED UPON AN ALTA <br />OR TOPOGRAPHIC SURVEY PREPARED BY _ DATED 1(X- XX -XXXX. IF CONTRACTOR DOES NOT ACCEPT DUSTING TOPOGRAPHY AS SHOWN ON THE PLANS WITHOUT EXCEPTION, THEY <br />SHALL HAVE MADE, AT THEIR EXPENSE, A TOPOGRAPHIC SURVEY BY A REGISTERED LAND SURVEYOR AND SUBMIT FT TO THE OWNER FOR REVIEW. SEE ATTACHED SURVEY SHEETS. <br />THE GENERAL CONTRACTOR SHALL TAKE AL PRECAUTIONS NECESSARY TO AVOID PROPERTY DAMAGE TO ADJACENT PROPERTIES DURING THE CONSTRUCTION PHASES OF THIS <br />PROJECT. THE CONTRACTOR WILL BE HELD SOLELY RESPONSIBLE FOR ANY DAMAGES OCCURRING TO THE ADJACENT PROPERTIES DURING THE CONSTRUCTION PHASES OF THIS <br />PROJECT. <br />5. THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) IS COMPRISED OF THIS DRAWING (EROSION & SEDIMENTATION CONTROL PL4N -0.51 PUN), THE STANDARD DETAIL$, THE <br />PLAN NARRATIVE, ANDIT5 APPENDICES, PLUS THE PERMIT AND ALL SUBSEQUENT REPORTS AND RELATED DOCUMENTS. <br />6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETING & SUBMITTING THE APPLICATION FOR THE MPCA GENERAL STORMWATER PERMIT FOR CONSTRUCTION ACTIVITY. ALL <br />CONTRACTORS AND SUBCONTRACTORS INVOLVED WITH STORM WATER POLL000N PREVENTION SHALL OBTAIN A COPY OF THE SWPPP AND THE STATE OF MINNESOTA NATIONAL <br />POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL PERMIT (NPDES PERMIT) AND BECOME FAMILIAR WITH THEIR CONTENTS. THE SWPPP AND ALL OTHER RELATED DOCUMENTS <br />MUST BE KEPT AT THE SITE DURING CONSTRUCTION. <br />CONTRACTOR SHALL IMPLEMENT BEST MANAGEMENT PRACTICES (BMPS) AS REQUIRED BY THE SWPPP & PERMITS. THE CONTRACTOR SHALL OVERSEE THE INSPECTION & <br />MAINTENANCE OF THE BMP'S AND EROSION PREVENTION FROM BEGINNING OF CONSTRUCTION AND UNTIL CONSTRUCTION 5 COMPLETED, IS APPROVED BY ALL AUTHORITIES, THE <br />NOTICE O TERMINATION (NOT) HAS BEEN FILED WITH THE MPCA BY EITHER THE OWNER OR OPERATOR AS APPROVED ON PERMIT. ADDITIONAL BMP'S SHALL BE IMPLEMENTED AS <br />DICTATED BY CONDMONS AT NO ADDITIONAL COST TO OWNER THROUGHOUT ALL PHASES OF CONSTRUCTION. <br />8. CONTRACTOR SHALL COMPLY WITH TRAINING REQUIREMENTS IN PART 1114,2 OF THE GENERAL PERMIT. <br />S. BMPS AND CONTROLS SHALL CONFORM TO FEDERAL STATE, OR LOCAL REQUIREMENTS OR MANUAL OF PRACTICE, AS APPLICABLE. CONTRACTOR SHALL IMPLEMENT ADDITIONAL <br />CONTROLS AS DIRECTED BY PERMITTING AGENCY OR OWNER. <br />10. ESC PLAN MUST CLEARLY DELINEATE ALL STATE WATERS. PERMITS FOR ANY CONSTRUCTION ACTW1TY IMPACTING STATE WATERS OR REGULATED WETLANDS MUST BE MAINTAINED <br />ON SITE AT ALL TIMES. <br />11 CONTRACTOR SHALL MINIMIZE CLEARING TO THE MAXIMUM EXTENT PRACTICAL OR A5 REQUIRED RY THE GENERAL PERMIT. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON <br />THE ESC PLANS SHALL BE CLEARLY DEUNEATED (E.G. WITH FLAGS, STAKES, SIGNS, SILT FENCE, ETC.) ON THE DEVELOPMENT SITE BEFORE WORK BEGINS. GROUND DISTURBING <br />ACTIVITIES MUST NOT OCCUR OUTSIDE THE LIMITS OF DISTURBANCE <br />GENERAL CONTRACTOR SHALL DENOTE ON PLAN THE TEMPORARY PARKING AND STORAGE AREA WHICH SHALL ALSO BE USED AS THE EQUIPMENT MAINTENANCE AND CLEANING <br />AREA EMPLOYEE PARKING AREA, AND AREA FOR LOCATING PORTABLE FACILITIES, OFFICE TRAILERS, AND TOILET FAQLmES. <br />13. ALL WASH WATER (CONCRETE TRU CKS, VEHICLE CLEANING, EQUIPMENT CLEANING, ETC.) MUST BE LIMITED TO A DEFINED AREA OF THE SITE AND SHALL BE CONTAINED AND <br />PROPERLY TREATED OR DISPOSED. NO ENGINE DEGREASING 15 ALLOWED ON SITE. <br />14. ALL LIQUID AND SOLID WASTES GENERATED BY CONCRETE WASHOUT OPERATIONS MUST BE CONTAINED IN A LEAK -PROOF CONTAINMENT FACILITY OR IMPERMEABLE LINER. A <br />COMPARED CLAY UNER THAT DOS NOT ALLOW WASHOUT LIQUIDS TO ENTER GROUND WATER 15 CONSIDERED AN IMPERMEABLE LINER THE 8QUID AND SOUD WASTES MUST NOT <br />CONTACTTHE GROUND, AND THERE MUST NOT BE RUNOFF FROM THE CONCRETE WASHOUT OPERATIONS OR AREAS. LIQUID AND SOLID WASTES MUST BE DISPOSED OF PROPERLY <br />AND IN COMPUNNCE WITH MPCA REGULATIONS. A SIGN MUST BE INSTALLED ADJACENT TO EACH WASHOUT FACILITY TO INFORM CONCRETE EQUIPMENT OPERATORS TO UTILIZE THE <br />PROPER FACILITIES. <br />15. SUFFICIENT OIL AND GREASE ABSORBING MATERIALS AND FLOTATION BOOMS SHALL BE MAINTAINED ON SITE OR READILY AVAILABLE TO CONTAIN AND CLEAN -UP FUEL OR <br />CHEMICAL SPILS AND ISMS. <br />16. DUST ON THE STTE SHALL BE CONTROLLED. THE USE OF MOTOR OILS AND OTHER PETROLEUM BASED OR TOXIC LIQUIDS FOR DUST SUPPRESSION OPERATIONS 5 PROHIBITED. <br />17. SOLID WASTE: COLLECTED SEDIMENT, ASPHALT & CONCRETE MILLINGS, FLOATING DEBRIS, PAPER, PLASTIC, FABRIC. CONSTRUCTION & DEMOLITION DEBTS & OTHER WASTES MUST <br />BE DISPOSED OF PROPERLY & MUST COMPLY WITH MPCA DISPOSAL REQUIREMENTS. <br />18. HAZARDOUS M4130,4S: OIL GASOLINE, PAINT & ANY HAZARDOUS SUBSTANCES MUST BE PROPERLY STORED, INCLUDING SECONDARY CONTAINMENT, TO PREVENT SPILLS, LEAKS OR <br />OTHER DISCHARGE. RESTRICTED ACCESS TO STORAGE AREAS MUST BE PROVIDED TO PREVENT VANDAUSM. STORAGE & DISPOSAL OF HAZARDOUS WASTE MUST BE IN COMPLIANCE <br />WITH MPCA <br />19. ALL STORM WATER POLLUTION PREVENTION MEASURES PRESENTED ON THIS PLAN, AND 11 THE SW PPP, SHALL BE INITIATED AS SOON AS PRACTICABLE AND PRIOR TO SOIL <br />DISTURBING ACTIVTES UPSLDPE. <br />20 DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY HAS STOPPED SHALL BE TEMPORARILY SEEDED, WITHIN 14 DAYS OF INACTIVITY. SEEDING SHALL BE IN <br />ACCORDANCE WITH MN /DOT SEED MIXTURE NUMBER 100 OR 110 DEPENDING ON THE SEASON OF PLANTING 15EE MN /DOT SPECIFICATION SECTION 2575.3) SEEDING METHOD AND <br />APPLICATION-RATE SHALL CONFORM TO MN /DOT SPECIFICATION SECTION 25753. TEMPORARY MULCH SHALL BE APPUED IN ACCORDANCE WITH MN/DOT SPECIFICATION SECTION <br />2575.301 AND 257536. ALTERNATIVELY, HYDRAUUC SOIL STABILIZER IN ACCORDANCE WITH MN/DDT SPECIFICATION SECTION 257534 MAY BE USED IN PLACE O TEMPORARY <br />MULCH. <br />21 DISTURBED PORTIONS OF THE SITE INHERE CON518010014 ACTIVITY HAS PERMANENTLY STOPPED SHALL BE PERMANENTLY STABILIZED. THESE AREAS SHALL BE STABILIZED IN <br />ACCORDANCE WITH THE TIMETABLE DESCRIBED ABOVE. REFER TO THE GRADING PLAN AND /OR LANDSCAPE PLAN FOR VEGETATIVE COVER. <br />22. CONTRACTORS OR SUBCONTRACTORS WILL BE RESPONSIBLE FOR REMOVING SEDIMENT FROM CONVEYANCES & FROM TEMPORARY SEDIMENTATION BASINS THAT ARE TO BE USED <br />AS PERMANENT WATER QUARRY MANAGEMENT BASINS. SEDIMENT MUST BE STABILIZED TO PREVENT R FROM BEING. WASHED BACK INTO THE BASIN, CONVEYANCES, OR <br />DRAINAGEWAYS DISCHARGING OFFSITE OR TO SURFACE WATERS. THE CLEANOUT OF PERMANENT 04SINSMUST BE SUFFICIENT TO RETURN THE BASIN TO 005161 CAPA CITY <br />23. ON -SITE & OFF -SITE SOIL STOCKPILE AND BORROW ARE/5 SHALL BE PROTECTED FROM EROSION AND SEDIMENTATION THROUGH IMPLEMENTATION OF BMPS. STOCKPILE AND <br />BORROW AREA LOCATIONS SHALL BE NOTED ON THE SITE MAP AND PERMOTED IN ACCORDANCE WITH GENERAL PERMIT REQUIREMENTS. <br />24. TEMPORARY SOIL STOCKPILES MUST HAVE SIM FENCE OR OTHER EFFECTIVE SEDIMENT CONTROLS & CANNOT BE RLACED IN SURFACE WATERS, INCLUDING STORMWATER <br />CONVEYANCES SUCH AS CURB & GUTTER SYSTEMS OR CONDUITS & DITCHES. <br />25. SLOPS SHALL BE LEFT IN A ROUGHENED CONDITION DURING THE GRADING PHASE TO REDUCE RUNOFF VELOCmES AND ER031019, <br />26. DUE TO THE GRADE CHANGES DURING THE DEVELOPMENT OF THE PROJECT, THE CONTRACTOR SHALL BERESPONSIRLE FOR - ADJUSTING THE EROSION CONTROL MEASURES (SILT <br />FENCES, CHECK DAMS, INLET PROTECTION DEVICES, ETC) TO PREVENT EROSION. <br />27. ALL CONSTRUCTION SHALL BE STABILIZED AT THE END OF EACH WORKING DAY, THIS INCLUDES MCKFIWNG OF TRENCHES FOP.-UTILITY CONSTRUCTION AND PLACEMENT OF GRAVEL <br />OR BRUMINOUSPAVING FOR ROAD CONSTRUCTION. <br />MAINTENANCE NOTES' <br />ALL MEASURES STATED ON THIS EROSION AND SEDIMENT CONTROL PLAN, AND IN THE STORM WATER POLLUTION PREVENTION PLAN SHALL BE MAINTAINED IN FULLY FUNCTIONAL <br />CONDITION UNO1 NO LONGER REQUIRED FORA COMPLETED PHASE OF WORK OR FINAL STABILIZATION OF THE SITE. THE DESIGNATED CONTACT PERSON NOTED ON THIS PLAN MUST <br />ROUTINELY INSPECT THE CONSTRUCTION ON 550E ONCE EVERY SEVEN DAYS DURING ACTIVE CONSTRUCTION AND WITHIN 24 HOURS AFTER A RAINFALL EVENT GREATER THAN 0.5 INCHES IN <br />24 HOURS. ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE CLEANED AND REPAIRED IN ACCORDANCE WITH THE FOLLOWING: <br />1 ALL SILT FENCES MUST BE REPAIRED REPLACED. OR SUPPLEMENTED WHEN THEY BECOME NONFUNCTIONAL OR THE SEDIMENT REACHES 1/3 O THE HEIGHT OF THE FENCE. THESE <br />REPAIRS MUST BE MADE WITHIN 24 HOURS OF DISCOVERY, OR AS SOON AS FIELD CONDITIONS ALLOW ACCESS. <br />2- TEMPORARY AND PERMANENT SEDIMENTATION BASINS MUST BE DRAINED AND THE SEDIMENT REMOVED WHEN THE DEPTH OF SEDIMENT COLLECTED IN THE BASIN REACHES 1/2 <br />THE STORAGE VOLUME. DRAINAGE AND REMOVAL MUST BE COMPLETED WITHIN R HOURS OF DISCOVERY, OR AS SOON AS FIELD CONDITIONS ALLOW ACCESS (SEE PART IV.D. OF <br />THE GENERAL PERMIT). <br />3. SURFACE WATERS, INCLUDING DRAINAGE DRCHS AND CONVEYANCE SYSTEMS, MUST BE INSPECTED FOREVIOENCE OF SEDIMENT BEING DEPOSITED BY EROSION. THE <br />CONTRACTOR MUST REMOVE ALL DELTAS AND SEDIMENT DEPOSITED IN SURFACE WATERS, INCLUDING DRAINAGE WAYS, CATCH BASINS, AND OTHER DRAINAGE SYSTEMS, AND <br />RESTABILIZE THE AREAS WHERE SEDIMENT REMOVAL RESULTS IN EXPOSED SOIL THE REMOVAL AND STABILIZATION MUST TAKE PLACE WITHIN SEVEN RI DAYS OF DISCOVERY <br />UNLESS PRECLUDED BY LEGAL REGULATORY, OR PHYSICAL ACCESS CONSTRAINTS. THE CONTRACTOR SHALL USE ALL REASONABLE EFFORTS TO OBTAIN ACCESS. IF PRECLUDED, <br />REMOVAL AND STABILIZATION MUST TAKE PLACE WITHIN SEVEN (7) CALENDAR DAYS OF OBTAINING ACCESS. THE CONTRACTOR 15 RESPONSIBLE FOR CONTACTING ALL LOCAL <br />REGIONAL STATE AND FEDERAL AUTHORMES AND RECEIVING ANY APPLICABLE PERMITS, PRIOR TO CONDUCTING ANY WORK <br />CONSTRUCTION SITE VEHICLE EXIT LOCATIONS MUST BE INSPECTED FOR EVIDENCE O OFF -SITE SEDIMENT TRACKING ONTO PAVED SURFACES. TRACKED SEDIMENT MUST BE <br />REMOVED FROM ALL OF -SITE PAVED SURFACES, WITHIN 24 HOURS OF DISCOVERY, OR IF APPLICABLE, WITHIN A SHORTER TIME TO COMPLY WITH PART IV.C6 OF THE GENERAL <br />PERMIT. <br />5. THE CONTRACTOR 15 RESPONSIBLE FOR THE OPERATION AND MAINTENANCE OF TEMPORARY AND PERMANENT WATER QUALITY MANAGEMENT BMPS, AS WELL AS ALL EROSION <br />PREVENTION AND SEDIMENT CONTROL BMPS FOR THE DURATION OF THE CONSTRUCTION WORK AT THE SHE. THE PERMITTEES ARE RESPONSIBLE UNTIL ANOTHER Mm <br />LE S ER O <br />HAS ASSUMED CONTROL SUBMIT ACCORDING TO EMIT II.BS OVER ALL AREAS OF THE SITE THAT HAVE NOT BEEN FINALLY STABILIZED OR THE SITE HAS UNDERGONE FINAL STABILIZATION, <br />AND A NOT HAS BEEN SUBMITTED TO THE MPCA <br />6. IF SEDIMENT ESCAPES THE CONSTRUCTION SITE, OFF-SITE ACCUMULATIONS O SEDIMENT MUST BE REMOVED IN A MANNER AND AT A FREQUENCY SUFFICIENT TO MINIMIZE <br />OFF -SITE IMPACTS (E.G., FUGITIVE SEDIMENT IN STREETS COULD BE WASHED INTO STORM SEWERS BY THE NEXT RAIN AND /OR POSE A SAFETY HAZARD TO USERS OF PUBLIC <br />STREETS). <br />ALL INFILTRATION AREAS MUST BE INSPECTED TO ENSURE THAT NO SEDIMENT FROM ONGOING CONSTRUCTION AC101I1E5 L5 REACHING THE INFILTRATION AREA AND THESE AREAS <br />0)113 PROTECTED FROM COMPACTION DUETO CONSTRUCTION EQUIPMENT DRIVING ACROSS THE INFILTRATION AREA. <br />fra <br />engineering survey' ng plannln5 energy , <br />14800 28th Ave. N, Ste 140 <br />Plymouth, Minnesota 55447 <br />(763) 476.6010 telephone <br />1763) 476.8532 facsimile <br />www.mtracom <br />Client <br />r- <br />2., CONSTRUCTION <br />IeII ;er <br />Project <br />BILL'S <br />SUPERETTE <br />Location <br />LINO LAKES, MN <br />Certification <br />I hereby certify that this plan, sputa <br />report was prepared by me or under( <br />supervision and that i am a duly li 3� <br />professional ENGINEER under tp t the state <br />of Minnesota. 4``_ <br />2661 Oate: 09 /07/2012 <br />contact us 10r a wet signed copy oY-thb <br />h i3 available upon request at MFRA Inc, <br />h, MN office. <br />Summary <br />Designed,M10 - Drawn: ABS <br />Approved: mu Book / Page: 727/55 <br />Phase: PRELIM Initiailssue: 09 /07/2012 <br />Revision History <br />No.Date By Submittal / Revision <br />03/20/11 SEG WATERSHED COMMENTS <br />8 10/15/12 176 CIT'COMMENTS <br />Sheet Title <br />EROSION AND <br />SEDIMENT <br />CONTROL <br />DETAILS <br />Sheet No. Revision <br />C5.03 B <br />Project No. FEN19355 <br />