My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03/27/2013 Env Bd Packet
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2013
>
03/27/2013 Env Bd Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2014 2:32:41 PM
Creation date
7/8/2014 9:24:19 AM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
03/27/2013
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.3. Other RMU Actions <br />This section includes implementation activities that have been identified for the remaining Resource <br />Management Units (RMUs), or subwatersheds, in the City of Lino Lakes. Most of the area in these <br />RMUs lies outside of proposed development areas through 2030. Therefore, these actions generally have <br />a low priority for implementation. As this section illustrates, there are fewer implementation activities <br />identified for these RMUs because of their low priority relative to those presented in Section 5.2 RMU <br />Specific Actions. As a result, if the need arises to develop a subwatershed management plan or Resource <br />Management Plan for these RMUs, the level of effort required to develop that plan for these RMUs may <br />be greater than for the previously discussed RMUs. <br />5.3.1 George Watch RMU Subwatershed <br />Table 12. RMU Specific Actions: George Watch RMU <br />5.3.2 Rondeau RMU Subwatershed <br />Table 13. RMU Specific Actions: Rondeau RMU <br />Employ Better Site Design (BSD) and volume control strategies to maintain recharge and avoid stormwater <br />discharges to Rondeau Lake. <br />Protect the large wetlands in the drainage area west of Rondeau Lake from stormwater input and from use for <br />stormwater treatment. <br />Develop Resource Management System Plan. <br />City of Lino Lakes SWMP 1 February 8, 2013 Draft 1 78 <br />Implement a network of BMPs in the conveyance area along Lake Drive NE to reduce stormwater discharges from <br />pond which currently outlets to a channel and ultimately enters stormwater- sensitive wetland complex (located <br />north of I -35W and south of Oak Lane). <br />Work with the commercial area north of George Watch Lake to implement stormwater retrofits (e.g. rain gardens <br />and pervious pavements) that will achieve volume control to mitigate loading to the large and highly susceptible <br />coniferous swamp located next to George Watch Lake. <br />Develop source control plan, in conjunction with new development for areas in the George Watch RMU north of <br />Hwy 14 to prevent loading to wetlands along with source control retrofits in areas draining to groundwater <br />wetlands. <br />Implement watershed -based measures to reduce the inputs from the direct drainage area to George Watch Lake <br />once the nutrient reduction goal is established as part of the Chain of Lakes TMDL. <br />Address the area where there is less than 1 foot of freeboard on the road. <br />Develop Subwatershed Management Plan. <br />5.3.2 Rondeau RMU Subwatershed <br />Table 13. RMU Specific Actions: Rondeau RMU <br />Employ Better Site Design (BSD) and volume control strategies to maintain recharge and avoid stormwater <br />discharges to Rondeau Lake. <br />Protect the large wetlands in the drainage area west of Rondeau Lake from stormwater input and from use for <br />stormwater treatment. <br />Develop Resource Management System Plan. <br />City of Lino Lakes SWMP 1 February 8, 2013 Draft 1 78 <br />
The URL can be used to link to this page
Your browser does not support the video tag.