My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03/27/2013 Env Bd Packet
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2013
>
03/27/2013 Env Bd Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2014 2:32:41 PM
Creation date
7/8/2014 9:24:19 AM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
03/27/2013
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 5.3.3 Peltier RMU Subwatershed <br />Table 14. RMU Specific Actions: Peltier RMU <br />Avoid discharges to Peltier Lake through implementation of infiltration BMPs on non - hydric soil upland areas and <br />implementation of small site storage and biofiltration BMPs on hydric soil areas that are developing. <br />Target wetland restoration projects in the northern drainage ditch of ACD 55 (a tile system) to alleviate flooding <br />problems and potentially generate mitigation credit. <br />Address the two areas within the City of Lino Lakes where there is less than 1 foot of freeboard on the road. <br />Develop Subwatershed Management Plan utilizing the concepts already developed by the City for a large flow - <br />through wetland system. <br />5.3.4 Hardwood Creek RMU Subwatershed <br />Table 15. RMU Specific Actions: Hardwood Creek RMU <br />Protect and buffer the high priority wetlands in the Hardwood Creek RMU <br />Ensure that existing culvert crossings will function under future conditions. <br />Address the wildlife barrier that exists as a result of the interstate and discuss options with MnDNOT to make <br />existing culvert a safer crossing for wildlife. <br />Develop Subwatershed Management Plan. <br />5.3.5 Upper Rice Creek RMU Subwatershed <br />Table 16. RMU Specific Actions: Upper Rice Creek RMU <br />Conduct inspections and maintenance to prevent flooding of major roads in Upper Rice Creek RMU in areas <br />planned for industrial, commercial and medium density residential land use (URC_001 and URC_002). <br />Ensure that existing culvert crossings will function under future conditions. <br />Develop Subwatershed Management Plan. <br />City of Lino Lakes SWMP February 8, 2013 Draft l 79 <br />
The URL can be used to link to this page
Your browser does not support the video tag.