My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03/27/2013 Env Bd Packet
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2013
>
03/27/2013 Env Bd Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2014 2:32:41 PM
Creation date
7/8/2014 9:24:19 AM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
03/27/2013
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.3.10 Baldwin RMU Subwatershed <br />Table 21. RMU Specific Actions: Baldwin RMU <br />Evaluate the potential to implement volume reduction practices in the catchments discharging to stormwater- <br />sensitive wetlands which are at risk under current conditions. <br />Develop Subwatershed Management Plan. <br />5.3.11 Middle Rice Creek RMU Subwatershed <br />Table 22. RMU Specific Actions: Middle Rice Creek RMU <br />Work with MnDOT to address corridor gaps and wildlife barriers in Middle Creek RMU. <br />Wetlands at risk from stormwater should be evaluated for reducing volume effects in the catchments. <br />Develop Resource Management System Plan. <br />5.3.12 Wilkinson RMU Subwatershed <br />Table 23. RMU Specific Actions: Wilkinson RMU <br />Develop Subwatershed Management Plan. <br />5.4. Implementation Costs <br />The estimated costs for the City of Lino Lakes to implement the city -wide and RMU- specific actions <br />included in this implementation plan as defined in Section 5.1 are summarized in Table 24. These actions <br />are broken down into 3 project types; 1) Capital Improvement Projects (CIP), 2) Programs, and 3) <br />Studies. Capital Improvement Projects include but are not limited to new stormwater capacity, quality or <br />volume control improvements as well as wetland mitigation or restoration activities. Programs include <br />ongoing education, inspection, maintenance, and pollution prevention activities that are necessary to <br />maintain the existing system and meet the requirements of the City's NPDES permit. The Study category <br />includes projects necessary to evaluate the City's system including subwatershed drainage plans and <br />feasibility studies. <br />Actions in the implementation plan as defined in Sections 5.2 and 5.3 are summarized in Table 25. The <br />total estimated cost to implement this plan, including City -wide and all RMU Subwatershed Areas, is <br />$2,901,800 over 10 years, or approximately $290,180 per year. It should be noted, that some of the costs <br />should be recovered through surface water management impact fees collected in conjunction with <br />development. While there are some infrastructure costs included here, it is fairly minimal on <br />infrastructure projects. The majority of costs are related to maintenance of the existing system and <br />satisfying the programmatic requirements of the City's NPDES permit. It is further assumed that once <br />the more detailed RMU Subwatershed Plans are completed, more of the infrastructure costs will be <br />defined so it can be included in developer fees for each area. <br />City of Lino Lakes SWMP 1 February 8, 2013 Draft 81 <br />
The URL can be used to link to this page
Your browser does not support the video tag.