Laserfiche WebLink
5.3.6 Rice Lake RMU Subwatershed <br />Table 17. RMU Specific Actions: Rice Lake RMU <br />5.3.7 Centerville RMU Subwatershed <br />Table 18. RMU Specific Actions: Centerville RMU <br />Conduct a feasibility study for the Lamotte Water Quality Improvement Project in conjunction with street <br />reconstruction planning. <br />5.3.8 Sherman RMU Subwatershed <br />Table 19. RMU Specific Actions: Sherman RMU <br />Evaluate the potential to implement volume reduction practices in the catchments discharging to stormwater- <br />sensitive wetlands which are at risk under current conditions. <br />5.3.9 Amelia RMU Subwatershed <br />Table 20. RMU Specific Actions: Amelia RMU <br />Work with MnDOT to evaluate wildlife crossings in future projects. <br />Restore the wetland on the private ditch that enters the lake on the north side in catchments AME -004 and AME- <br />005 in the Amelia RMU. <br />Develop Subwatershed Management Plan. <br />Work with the Vadnais Lakes Area Watershed Management Organization (VLAWMO) to evaluate the feasibility of <br />projects in the Amelia RMU. <br />City of Lino Lakes SWMP 1 February 8, 2013 Draft! 80 <br />Conduct feasibility studies to quantify the potential for retrofit (in site volume control measures) projects in the <br />northwest portion of the Rice Lake RMU (an area with very sandy soils). <br />Decrease stormwater flows to the sensitive wetlands located in catchment RLA -021 on the north side of Lake <br />Drive. <br />Implement urban retrofits (on -site volume control measures) to address the two sensitive water level points at <br />ponds in the south Rice Lake neighborhood. All wetlands in the neighborhood are already being used for <br />stormwater. <br />Evaluate nutrient loading through stormsewer lines to area wetlands in the Rice Lake RMU. <br />Reduce nutrient loading by optimizing the wetland and channel interaction in the Rice Lake RMU. <br />Develop Subwatershed Management Plan. <br />5.3.7 Centerville RMU Subwatershed <br />Table 18. RMU Specific Actions: Centerville RMU <br />Conduct a feasibility study for the Lamotte Water Quality Improvement Project in conjunction with street <br />reconstruction planning. <br />5.3.8 Sherman RMU Subwatershed <br />Table 19. RMU Specific Actions: Sherman RMU <br />Evaluate the potential to implement volume reduction practices in the catchments discharging to stormwater- <br />sensitive wetlands which are at risk under current conditions. <br />5.3.9 Amelia RMU Subwatershed <br />Table 20. RMU Specific Actions: Amelia RMU <br />Work with MnDOT to evaluate wildlife crossings in future projects. <br />Restore the wetland on the private ditch that enters the lake on the north side in catchments AME -004 and AME- <br />005 in the Amelia RMU. <br />Develop Subwatershed Management Plan. <br />Work with the Vadnais Lakes Area Watershed Management Organization (VLAWMO) to evaluate the feasibility of <br />projects in the Amelia RMU. <br />City of Lino Lakes SWMP 1 February 8, 2013 Draft! 80 <br />