Laserfiche WebLink
Use of the PUD process allows for Better Site Design practices throughout the site. Key <br />provisions include: <br />• Reduced right -of -way from 60 feet to 50 feet. <br />• Reduced street width from 32 feet to 28 feet. <br />• Reduced front yard setbacks from 30 feet to 25 feet. <br />These techniques are consistent with those previously implemented in the adjacent <br />Foxborough and Preserve neighborhoods. <br />SWPPP <br />The Storm Water Pollution Prevention Plan (SWPPP) must address the following: <br />• Proposed erosion prevention and sediment control BMP's to control the discharge <br />of sediment and/or other pollutants from the site, particularity at the point(s) of <br />intended discharge. All surrounding stormwater inlet drains within 200 feet of the <br />site that have water draining to them must have a city approved stormwater inlet <br />protection device installed prior to construction. <br />• Must provide the knowledgeable person/chain of responsibility information <br />before construction begins. We need the name of the person that is knowledgeable <br />and experienced in the application of erosion prevention before and during <br />construction. The owner must identify who will have the responsibility for long- <br />term operation and maintenance of the permanent stormwater management <br />system. The owner must include in the SWPPP a chain of responsibility with all <br />operators on the site, or if not known, the title or position of the responsibility of <br />responsible party, to ensure that the SWPPP will be implemented and stay in <br />effect until the construction project is complete, the entire site has undergone final <br />stabilization and a "Notice of Termination" has been submitted to the MPCA. <br />• The permitees must, before construction begins, provide training documentation <br />that the individuals listed as SWPPP overseers are certified by a MPCA approved <br />training method. With that, the City would need names of the person or persons <br />involved with SWPPP management, dates of training and the names of <br />instructors of entity providing training, and the content of the training course or <br />workshop including the numbers of hours training, <br />• Information must be submitted to the city on the location of the SWPPP on site <br />and the location of all required weekly, post - rainfall event inspections and follow - <br />up corrections. A hard copy must be kept on site and emailed to the city MS4 <br />manager. <br />• The SWPPP must incorporate the requirements (MPCA Stormwater Discharge <br />Design Requirements) including calculations for the project. <br />• Site specific quantities must be included for all erosion prevention and sediment <br />control BMPs. <br />6 <br />• <br />• <br />• <br />