My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12/18/2013 Env Bd Packet
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2013
>
12/18/2013 Env Bd Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2014 2:34:35 PM
Creation date
7/8/2014 11:34:07 AM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
12/18/2013
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />21.3 Require a traffic impact analysis for all development projects within the AUAR <br />area. The traffic impact analysis will assist the City and other road authorities in <br />determining the appropriate mitigation measures that are required to mitigate <br />impacts of a specific development proposal. <br />21.4 Work with appropriate road authorities to mitigate the impact of the additional <br />traffic on the on the regional system, specifically Interstates 35W and 35E, by <br />reconstructing each to provide a six -lane cross - section consistent with the <br />recommendations outlined in the I -35 IRC. It should be noted that it was <br />determined that an expansion will be necessary even without the development <br />scenarios used in this analysis. As the interstates serve a much larger area, the <br />projected growth of the entire Twin Cities region should warrant expansion by the <br />year 2030. <br />21.5 Prioritize alternative travel modes within the AUAR study area and require <br />project proposers to address alternative travel modes (e.g., buses, bicyclists, and <br />pedestrians) by identifying appropriate accommodations. <br />21.6 Consider the need for additional infrastructure improvements (see item #21.2) in <br />future updates or amendments to the Comprehensive Plan. Submit the plan <br />update to the appropriate agencies (i.e., FHWA, MnDOT, Met Council, etc.). <br />21.7 Require project proposers to follow all appropriate guidelines and policies related <br />to traffic nose and noise walls. <br />21.8 Require that site plans for each of the developments include measures such as <br />appropriate setback distances, earthen berms, noise walls, and appropriate site <br />design to reduce the impact of traffic noise to residential areas. <br />21.9 Continue to require the implementation of the conditions of approval for the Eagle <br />Brook Church relating to mitigating traffic impacts. <br />21.10 Achieve effective traffic operations within the city by requiring that site plans <br />make use of access management practices to promote sate, effective traffic flow. <br />21.11 Require project proposers to follow the Anoka County Highway Department <br />Development Review Process Manual (dated December 2003.) <br />21.12 Continue to coordinate capital improvement programming with applicable <br />transportation authorities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.