My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01/05/2004 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
2004 Park Board Packets
>
01/05/2004 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2014 5:10:29 PM
Creation date
7/8/2014 1:06:10 PM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
01/05/2004
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Top dressed fields 6, 7, 8 at Centennial Middle School. <br />• Hazard tree removal — Wenzel Farms trail and Highland Meadows Park. <br />• Attended safety training — AWAIR. <br />• Pruned encroaching limbs along trails. <br />• Inspect and inventory (measure) trails. <br />• Ran electric to Clearwater Creek gazebo (contracted). <br />• Installed timer for rink lights at City Hall Park (contracted). <br />• Cleaned and prepped wood duck houses. Out of 54 total boxes 39 or 72% had successful <br />wood duck hatches. Approximately 200 ducklings were hatched from the successful <br />boxes, which is about 5 ducklings per box. <br />Those are the highlights for November and December. Happy New Year! <br />sw /parkbrd/Mike/November- December 03 Park Update <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.