My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03/31/2004 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
2004 Park Board Packets
>
03/31/2004 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2014 4:09:21 PM
Creation date
7/8/2014 1:29:22 PM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
03/31/2004
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lino Lakes Parks and Recreation Department <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />(651) 982 -2440 Fax (651) 982 -2439 <br />www.ci.lino- lakes.mn.us <br />March 22, 2004 <br />TO: Park Board Members <br />FROM: Mike Hoffman, Parks Supervisor <br />SUBJECT: March 2004 Maintenance Update <br />As we near the end of March we are beginning to gear up for another busy spring. Maintenance <br />activities during the month have included: <br />• Ice removal from tunnel to Rice Lake Elementary. This is a yearly project as the snows <br />melt and run into the tunnel. <br />• Collected hockey goals from rinks. <br />• Hockey goal repair — removed nets, welded and straightened goals. We will paint the <br />goals soon. <br />• Assisted Public Works with snow removal as needed. <br />• Equipment maintenance — Rebuilt core aerifier and chain saw maintenance. <br />• Inventoried and ordered softball supplies. <br />• Cleaned and painted bases. <br />• Prepped wood duck houses for spring. <br />• Cleaned warming houses — rolled up and stored mats. <br />• Chipped xmas trees. <br />• Painted bluebird houses. <br />• Removed fishing dock at Country Lakes Park. Dock has become damaged due to ice <br />heaving. We will attempt to repair and reinstall this spring. <br />• Landscape design for Clearwater Creek Park sign and Lino Park Building. <br />• Ordered plant materials for spring planting. <br />• Attended Shade Tree Short Course, irrigation training, and Sports Turf Seminar. <br />• Updated trail inspection manual. <br />• Pumped water from Clearwater Creek Park playground drain from playground. Drain <br />from playground to catch basin is frozen. <br />Those are March's major highlights. Much more to come in April. <br />sw /parkbrd/mike/March 04 Park Update.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.