Laserfiche WebLink
• <br />• <br />• Fertilized 40 acres of athletic field turf. <br />■ Poured gazebo pad at Birch Park (contracted). <br />✓ Basketball courts at Rice Lake Elementary and Behm's Park: <br />Installed bituminous surface (contracted). <br />Installed ground sockets (contracted). <br />Applied base color (2 coats) project should be complete by June 11 (contracated). <br />• Shenandoah Park — Cleaned up and seeded debris piles left by contractors after ditch <br />cleaning. <br />✓ Highland Meadows — Poured 10x10 concrete pad, built 8x8 shed, (shed encloses <br />irrigation equipment. Will also be used for recreation program storage). <br />✓ Removed hazard trees near trails at Langer Lane and Country Lakes Park. <br />✓ Irrigation startup and repair at Birch and Sunrise Parks. <br />✓ Core aerated soccer fields at Centennial Middle School and Rice Elementary School. <br />✓ Emptied Kaiser garage (stored chalk, field dry, etc.) House has been burned; garage will <br />either be moved off site or demolished on site. <br />Those are May's Highlights. Someone please shut off the water. <br />sw /parkbrd/mike/May 04 Update.doc <br />